Filter by:

Post Occupancy Evaluation

Post Occupancy Evaluation

Introduction: This Post Occupancy Evaluation (POE) aims to assess the effectiveness of facility management practices within the occupied space. The evaluation seeks to generate objective insights into various aspects of facility management to enhance operational efficiency, user satisfaction, and overall building performance.

Evaluation Criteria:

  1. Maintenance Effectiveness:

    • Assess the responsiveness and quality of maintenance services provided.

    • Evaluate the condition of building systems and components.

  2. Safety and Security:

    • Review safety protocols and emergency preparedness measures.

    • Evaluate the effectiveness of security systems and procedures.

  3. Operational Efficiency:

    • Analyze energy consumption and utility usage patterns.

    • Assess the efficiency of facility operations and resource management.

  4. Space Utilization:

    • Evaluate the utilization of space within the building.

    • Assess the flexibility and adaptability of space to accommodate changing needs.

  5. Environmental Sustainability:

    • Review initiatives and practices aimed at reducing environmental impact.

    • Assess compliance with sustainability standards and certifications.

  6. User Satisfaction:

    • Gather feedback from building occupants regarding facility amenities and services.

    • Assess overall satisfaction with the building environment.

  7. Compliance and Regulations:

    • Ensure compliance with relevant building codes, regulations, and industry standards.

    • Review documentation and records to verify adherence to legal requirements.


Instructions for Rating:

Please rate each criterion on a scale from 1 to 5, where:

1 - Poor

2 - Fair

3 - Good

4 - Very Good

5 - Excellent

Evaluation Table:

Criteria

Evaluation

Maintenance Effectiveness

Safety and Security

Operational Efficiency

Space Utilization

Environmental Sustainability

User Satisfaction

Compliance and Regulations

Comment/Feedback

Please provide any additional comments or feedback regarding the facility management practices or this evaluation process.

Evaluator Details:

Evaluator Name: [Your Name]

Position/Role: [Position/Role]

Date of Evaluation: [Insert Date]

Evaluation Templates @ Template.net