Bathroom Remodel Scope Of Work
Bathroom Remodel Scope Of Work
Project Overview:
The project entails renovating the master bathroom located at HOMEADDRESS]. The goal is to create a luxurious, functional, and modern space that meets the homeowner's needs and preferences while enhancing the overall value and appeal of the home.
Scope Details:
-
Design Consultation:
-
Collaborate with the homeowner to understand their vision, style preferences, and functional requirements for the master bathroom.
-
Engage an interior designer or architect to develop design concepts, layouts, and material selections that align with the homeowner's aesthetic and budget.
-
-
Demolition and Removal:
-
Remove existing fixtures, fittings, tiles, and cabinetry to prepare the space for renovation.
-
Dispose of debris and old materials in accordance with local regulations and waste management practices.
-
-
Plumbing and Electrical Work:
-
Assess and update plumbing systems to ensure proper functionality and water efficiency.
-
Install new fixtures, including sinks, faucets, showerheads, and toilets, according to the updated design specifications.
-
Upgrade electrical wiring, outlets, and lighting fixtures to meet safety standards and accommodate modern amenities.
-
-
Carpentry and Cabinetry:
-
Construct custom cabinetry or vanities to maximize storage space and complement the overall design aesthetic.
-
Install countertops, backsplashes, and hardware that enhance the functionality and visual appeal of the bathroom.
-
-
Flooring and Wall Finishes:
-
Lay new flooring materials, such as ceramic tiles, natural stone, or luxury vinyl, that are durable and water-resistant.
-
Apply waterproofing membranes and sealants to prevent moisture damage and ensure longevity.
-
Install wall finishes, such as paint, wallpaper, or tile, that complement the overall design scheme and create a cohesive look.
-
-
Fixtures and Accessories:
-
Select and install high-quality fixtures, including bathtubs, showers, mirrors, and towel racks, that enhance comfort and convenience.
-
Incorporate luxury amenities, such as heated floors, steam showers, and spa-like features, to create a relaxing and indulgent retreat.
-
Project Timeline:
Task |
Duration |
---|---|
Design Consultation |
2 weeks |
Demolition and Removal |
1 week |
Plumbing and Electrical Work |
2 weeks |
Carpentry and Cabinetry |
3 weeks |
Flooring and Wall Finishes |
2 weeks |
Fixtures and Accessories |
1 week |
Final Inspection and Cleanup |
1 week |
Deliverables:
-
Completed master bathroom renovation with updated fixtures, finishes, and amenities.
-
Design plans, material selections, and specifications documentation.
-
Warranty information for installed fixtures and materials.
-
Maintenance recommendations and care instructions for long-term upkeep.
Budget Allocation:
Category |
Estimated Cost ($) |
---|---|
Design and Consultation |
$2,000 |
Demolition and Removal |
$1,500 |
Plumbing and Electrical Work |
$5,000 |
Carpentry and Cabinetry |
$8,000 |
Flooring and Wall Finishes |
$4,000 |
Fixtures and Accessories |
$3,500 |
Contingency |
$2,000 |
Total Project Budget |
$26,000 |
Project Team:
Role |
Name(s) |
---|---|
Home Renovation Contractor |
[NAME] |
Interior Designer/Architect |
[NAME] |
Plumbers and Electricians |
[NAME] |
Carpenters and Installers |
[NAME] |
Communication Plan:
Regular meetings, progress updates, and site inspections will be conducted to keep the homeowner informed and ensure alignment with project goals and expectations.
Signature:
Date:[DATE]