Free Interior Design Cost Evaluation Template
Interior Design Cost Evaluation
Project Name: [Project Name]
Client: [Second Party]
Date: [Date]
1. Project Overview
The [Project Name] aims to transform an outdated loft space into a contemporary living area that reflects the client's modern aesthetic preferences. The scope includes redesigning the layout, selecting new materials and finishes, furnishing the space, and managing the renovation process from conception to completion.
2. Scope of Work
The following tasks and services will be provided as part of the project:
Task |
Description |
---|---|
Concept Development |
Creation of two design concepts and mood boards |
Space Planning |
Layouts for furniture placement and traffic flow |
Selection of Materials and Finishes |
Choosing high-quality materials, colors, and textures |
Furniture and Fixture Selection |
Selection and procurement of contemporary furniture |
Lighting Design |
Design and selection of modern lighting fixtures |
Coordination with Contractors |
Collaboration with contractors for implementation |
Project Management |
Overseeing the project from start to completion |
3. Cost Estimates
3.1 Materials and Finishes
Item |
Quantity |
Unit Cost ($) |
Total Cost ($) |
---|---|---|---|
Hardwood Flooring |
[0] sq ft |
$[0]/sq ft |
$[0] |
Paint |
[0] gallons |
$[0]/gallon |
$[0] |
Porcelain Tiles (for bathroom) |
[0] sq ft |
$[0]/sq ft |
$[0] |
Upholstery Fabric |
- |
- |
$[0] |
Window Treatments Fabric |
- |
- |
$[0] |
3.2 Furniture and Fixtures
Item |
Quantity |
Unit Cost ($) |
Total Cost ($) |
---|---|---|---|
Sectional Sofa |
[0] |
$[0] |
$[0] |
Dining Table |
[0] |
$[0] |
$[0] |
Accent Chairs |
[0] |
$[0] |
$[0] |
Pendant Lights |
[0] |
$[0] |
$[0] |
Area Rug |
[0] |
$[0] |
$[0] |
3.3 Labor Costs
Task |
Hours |
Hourly Rate ($) |
Total Cost ($) |
---|---|---|---|
Concept Development |
20 hours |
$[0]/hour |
$[0] |
Space Planning |
15 hours |
$[0]/hour |
$[0] |
Installation of Materials and Fixtures |
- |
- |
$[0] |
Project Management |
30 hours |
$[0]/hour |
$[0] |
4. Additional Expenses
In addition to the direct project costs outlined above, the following additional expenses are anticipated:
-
Permit fees: The estimated cost for obtaining necessary permits from the local authorities for the renovation work.
-
Delivery and shipping charges: These charges include transportation costs for delivering materials, furniture, and fixtures to the project site.
-
Contingency fund: A contingency fund of 10% of the total project cost is allocated to cover unforeseen expenses or changes in scope that may arise during the course of the project, ensuring that sufficient funds are available to address any unexpected challenges.
5. Total Project Cost
The total estimated cost of the [Project Name], including all direct expenses and additional costs, is calculated as follows:
Direct Project Costs: $[0]
Additional Expenses:
-
Permit fees: $[0]
-
Delivery and shipping charges: $[0]
-
Contingency fund (10% of total project cost): $[0]
Total Project Cost: $[0]