Free Daily Job Site Report Template

DAILY JOB SITE REPORT

Prepared By

Company

Date Prepared

[Your Name]

[Your Company Name]

[DATE]


I. Weather Conditions

  • Date: June 10, 2024

  • Weather: Partly Cloudy

  • Temperature: 75°F (24°C)

  • Wind Speed: 10 mph

II. Work Completed

A. Tasks Accomplished

  • Task 1: Completed pouring concrete for the foundation of Building A.

  • Task 2: Installed electrical wiring on the first floor of Building B.

  • Task 3: Framing work continued on the second floor of Building C.

B. Areas Worked On

  • Area 1: Foundation area for Building A.

  • Area 2: First floor of Building B for electrical installations.

  • Area 3: The second floor of Building C is for framing.

C. Progress Notes

Notes: The foundation work for Building A was completed ahead of schedule. Electrical installations in Building B are progressing smoothly, and we anticipate completing this phase by the end of the week. Framing on Building C is on track, with no major issues reported.

III. Labor and Personnel

Name

Role

Hours Worked

John Doe

Foreman

8

Jane Smith

Electrician

8

Alice Johnson

Laborer

8

Robert Brown

Carpenter

8

Michael White

Concrete Specialist

8

IV. Equipment and Materials

Equipment/Material

Quantity

Status

Excavator

2

Operational

Concrete

10 cubic meters

Delivered

Steel Beams

15

In Use

Electrical Cables

500 meters

In Use

Framing Lumber

200 planks

In Use

V. Safety Incidents

the and Incident

Description

Actions Taken

Slip and Fall

The worker slipped on a wet surface

Provided first aid, cleaned area

Equipment Malfunction

Crane malfunctioned

Repaired and inspected

Minor Cut

Worker cut finger while handling tools

Administered first aid

VI. Delays and Issues

A. Task Delays

  • Task: Electrical wiring installation in Building B.

  • Reason: Delivery of electrical cables was delayed by one day.

B. Resource Shortages

  • Resource: Framing Lumber.

  • Impact: Work on the second floor of Building C slowed down due to insufficient lumber supply. Additional lumber has been ordered and is expected to arrive tomorrow.

C. Other Issues

  • Issue: Noise complaints from neighboring properties.

  • Solution: Adjusted working hours and informed the crew to minimize loud activities during early morning and late evening hours.

VII. Visitor Log

Visitor Name

Purpose of Visit

Time In

Time Out

Emily Green

Client Representative

9:00 AM

10:30 AM

David Miller

Safety Inspector

11:00 AM

12:00 PM

Sarah Wilson

Supplier (Delivered materials)

2:00 PM

2:30 PM

[SUPERVISOR'S NAME]

[DATE SIGNED]


Report Templates @ Template.net