Electrical Construction Daily Report
Electrical Construction Daily Report
I. Introduction
Date: June 21, 2050
Project Name: Skyline Towers Electrical Installation
Report Prepared By: [YOUR NAME]
Position: Electrical Supervisor
Contact Information: [YOUR EMAIL]
Company: [YOUR COMPANY NAME]
Company Address: [YOUR COMPANY ADDRESS]
Company Website: [YOUR COMPANY WEBSITE]
II. Work Performed
Tasks Completed
Task |
Description |
---|---|
Installed Main Electrical Panels |
Installed panels on floors 1 through 5. Connected primary power lines, and labeled and tested all breakers. |
Routed Conduit for Lighting Circuits |
Routed conduit on floors 6 and 7, ensuring proper fitting and securing of conduit pathways. |
Rough-in Wiring for Lobby Area |
Pulled electrical wires through conduits, made splices, and connected wires to junction boxes. |
Insulation Resistance Testing |
Conducted tests on floors 1 and 2; all circuits passed, indicating proper insulation. |
Labor
Category |
Number of Workers |
Total Man-hours |
---|---|---|
Electricians |
10 |
80 hours |
Apprentices |
4 |
32 hours |
Total |
14 |
112 hours |
III. Materials
Materials Used
Material |
Quantity Used |
---|---|
3/4" EMT Conduit |
1,500 feet |
12 AWG THHN Wire |
3,000 feet |
Main Breaker Panels |
20 units |
Materials Received
Material |
Quantity Received |
---|---|
Light Fixtures |
50 units |
14 AWG Wire |
10,000 feet |
IV. Equipment
Equipment Used
Equipment |
Quantity Used |
---|---|
Scissor Lifts |
2 |
Cordless Drills |
4 |
Conduit Benders |
3 |
Equipment Issues
Issue |
Description |
Action Taken |
---|---|---|
Scissor Lift Hydraulic Issue |
One scissor lift experienced hydraulic problems. |
Sent for repair, replacement expected by 6/23/2050. |
V. Inspections and Testing
-
Insulation Resistance Testing: Conducted on floors 1 and 2 to ensure all installed wiring met safety standards. All tests passed, with insulation resistance values well within acceptable ranges.
-
Upcoming Inspection: Scheduled inspection for the main electrical panels by the city electrical inspector on June 23, 2050. Preparations are underway to ensure compliance with all regulatory requirements.
VI. Safety
Safety Measures
Safety Measure |
Description |
---|---|
Daily Safety Briefing |
Conducted at 7:00 AM, covered PPE and emergency procedures. |
PPE Compliance Check |
Ensured all workers wore required PPE. |
Incidents:
-
No safety incidents or injuries occurred on site today.
VII. Weather Conditions
Condition |
Details |
---|---|
Temperature |
85°F |
Humidity |
60% |
Wind |
10 mph |
Impact on Work |
None |
VIII. Delays or Issues
Delays:
-
Scissor Lift Repair: The hydraulic issue with the scissor lift caused a delay in conduit installation on floor 8. The lift has been sent for repair, and work will resume once the replacement arrives.
Issues:
-
Material Shortage: There was a shortage of 2" EMT conduit required for the main electrical room. An order has been placed, but the delivery has been delayed by 2 days, impacting the schedule for conduit installation in that area.
IX. Visitors or Site Meetings
Visitors:
-
Building Inspector Visit: The city building inspector visited the site to review electrical rough-ins. No issues were found, and the inspector was satisfied with the progress and quality of work.
Meetings:
-
Site Coordination Meeting: Held at 3:00 PM with the general contractor and the plumbing supervisor. Discussed the upcoming week's schedule, coordination of tasks to avoid overlap, and strategies to mitigate the impact of the scissor lift repair on the overall project timeline.
X. Conclusion
Overall, significant progress was made today with the installation of main electrical panels and routing of conduit. Despite minor delays due to equipment issues, the project remains on track. Continued focus on safety and adherence to the schedule will ensure timely completion of the electrical installation.