Electrical Construction Daily Report

Electrical Construction Daily Report

I. Introduction

Date: June 21, 2050
Project Name: Skyline Towers Electrical Installation
Report Prepared By: [YOUR NAME]
Position: Electrical Supervisor
Contact Information: [YOUR EMAIL]
Company: [YOUR COMPANY NAME]
Company Address: [YOUR COMPANY ADDRESS]
Company Website: [YOUR COMPANY WEBSITE]

II. Work Performed

Tasks Completed

Task

Description

Installed Main Electrical Panels

Installed panels on floors 1 through 5. Connected primary power lines, and labeled and tested all breakers.

Routed Conduit for Lighting Circuits

Routed conduit on floors 6 and 7, ensuring proper fitting and securing of conduit pathways.

Rough-in Wiring for Lobby Area

Pulled electrical wires through conduits, made splices, and connected wires to junction boxes.

Insulation Resistance Testing

Conducted tests on floors 1 and 2; all circuits passed, indicating proper insulation.

Labor

Category

Number of Workers

Total Man-hours

Electricians

10

80 hours

Apprentices

4

32 hours

Total

14

112 hours

III. Materials

Materials Used

Material

Quantity Used

3/4" EMT Conduit

1,500 feet

12 AWG THHN Wire

3,000 feet

Main Breaker Panels

20 units

Materials Received

Material

Quantity Received

Light Fixtures

50 units

14 AWG Wire

10,000 feet

IV. Equipment

Equipment Used

Equipment

Quantity Used

Scissor Lifts

2

Cordless Drills

4

Conduit Benders

3

Equipment Issues

Issue

Description

Action Taken

Scissor Lift Hydraulic Issue

One scissor lift experienced hydraulic problems.

Sent for repair, replacement expected by 6/23/2050.

V. Inspections and Testing

  • Insulation Resistance Testing: Conducted on floors 1 and 2 to ensure all installed wiring met safety standards. All tests passed, with insulation resistance values well within acceptable ranges.

  • Upcoming Inspection: Scheduled inspection for the main electrical panels by the city electrical inspector on June 23, 2050. Preparations are underway to ensure compliance with all regulatory requirements.

VI. Safety

Safety Measures

Safety Measure

Description

Daily Safety Briefing

Conducted at 7:00 AM, covered PPE and emergency procedures.

PPE Compliance Check

Ensured all workers wore required PPE.

Incidents:

  • No safety incidents or injuries occurred on site today.

VII. Weather Conditions

Condition

Details

Temperature

85°F

Humidity

60%

Wind

10 mph

Impact on Work

None

VIII. Delays or Issues

Delays:

  • Scissor Lift Repair: The hydraulic issue with the scissor lift caused a delay in conduit installation on floor 8. The lift has been sent for repair, and work will resume once the replacement arrives.

Issues:

  • Material Shortage: There was a shortage of 2" EMT conduit required for the main electrical room. An order has been placed, but the delivery has been delayed by 2 days, impacting the schedule for conduit installation in that area.

IX. Visitors or Site Meetings

Visitors:

  • Building Inspector Visit: The city building inspector visited the site to review electrical rough-ins. No issues were found, and the inspector was satisfied with the progress and quality of work.

Meetings:

  • Site Coordination Meeting: Held at 3:00 PM with the general contractor and the plumbing supervisor. Discussed the upcoming week's schedule, coordination of tasks to avoid overlap, and strategies to mitigate the impact of the scissor lift repair on the overall project timeline.

X. Conclusion

Overall, significant progress was made today with the installation of main electrical panels and routing of conduit. Despite minor delays due to equipment issues, the project remains on track. Continued focus on safety and adherence to the schedule will ensure timely completion of the electrical installation.