Backflow Test Report

Backflow Test Report

I. Introduction

This Backflow Test Report has been prepared by [YOUR COMPANY NAME] for the backflow prevention device located at [YOUR COMPANY ADDRESS]. The testing was conducted on June 1, 2050, by [YOUR NAME], who is certified in backflow prevention testing.

II. Test Details

Detail

Information

Test Date:

June 1, 2050

Tester:

[YOUR NAME]

Certification No:

BCPT-08428

Test Equipment:

Digital Pressure Gauge, Flow Meter

III. Site Information

Detail

Information

Site Name:

[SITE NAME]

Site Address:

[SITE ADDRESS]

Site Contact Person:

Eula Green

Contact Email:

[email protected]

Contact Phone:

+1 (541) 590-4579

IV. Backflow Prevention Device Details

Detail

Information

Device Type:

Double Check Valve Assembly (DCVA)

Manufacturer:

[MANUFACTURING COMPANY NAME]

Model:

DCVA-631-219-1852

Serial Number:

DCVA-718-392-6412

Installation Date:

March 15, 2048

Location:

Utility Room, Basement

V. Test Procedure

The backflow prevention device was tested according to local regulations and standards. The test procedures included:

  • Visual Inspection: No visible signs of damage or wear observed on the device body, valves, or fittings.

  • Pressure Test: The device was pressurized to 10 psi and maintained this pressure for 5 minutes without any pressure drop, indicating no leaks or internal defects.

  • Flow Test: Water flow was varied between normal and peak flow rates (5 GPM), and the device successfully prevented backflow in both scenarios.

VI. Test Results

The backflow prevention device passed the test based on the following observations:

Test Type

Results and Observations

Visual Inspection

The device exhibited no signs of corrosion, damage, or deterioration.

Pressure Test

The device held pressure at 10 psi consistently without any pressure drop.

Flow Test

During flow variations, the device maintained integrity and prevented backflow effectively.

VII. Recommendations

Based on the test results, the following recommendations are provided:

  • Maintenance: Schedule annual maintenance checks to ensure all components remain in good condition.

  • Monitoring: Implement a monitoring schedule to regularly check the device's functionality between annual tests.

  • Education: Provide training for on-site staff regarding the importance of maintaining the backflow prevention device and recognizing signs of potential issues.

VIII. Conclusion

This Backflow Test Report confirms that the backflow prevention device at [SITE NAME] meets the required standards as of the test date. The device demonstrated effective operation during all phases of the test, including visual inspection, pressure testing, and flow testing.

Report Templates @ Template.net