Free Construction Daily Work Report Template

Construction Daily Work Report

I. Project Information

  • Project Name: [Project Name]

  • Project Location: [Project Location]

  • Report Date: [Date]

  • Prepared By: [Your Name]

II. Work Performed

1. Summary of Work

  • Task 1: Excavation and foundation work

  • Task 2: Structural steel framing

  • Task 3: Electrical conduit installation

2. Equipment Used

The pieces of equipment used for the day are:

  • Excavator

  • Crane

  • Concrete Mixer

3. Labor Force

Skilled Labor:

Unskilled Labor:

Supervisors:

20 workers

15 workers

5

III. Materials Delivered

New materials delivered to the site today include:

  • Reinforcement Steel

  • Concrete

  • Electrical Wiring

IV. Inspections

1. Safety Inspections

  • A daily toolbox meeting is conducted.

  • Adhering to the prescribed guidelines for the utilization of personal protective equipment (PPE).

  • The fall protection systems have been thoroughly checked and inspected.

2. Quality Inspections

  • Tests were conducted to determine the strength of concrete.

  • Inspections of steel welding processes and joints.

  • Comprehensive examinations and inspections for the proper installation of electrical conduits.

V. Issues/Delays

  • The delays in the schedule are caused by inclement weather, specifically due to heavy rainfall.

  • The excavator has experienced an equipment breakdown.

VI. Signature

Reported By: [Your Name]

Date: [Date Signed]


If there are any questions or concerns, please contact:

[Your Company Name]

[Your Company Address]

[Your Company Website]

[Your Company Social Media]

Report Templates @ Template.net