Civil Construction Daily Report
Civil Construction Daily Report
Date: January 1, 2050
Project: Downtown Bridge Expansion
Report By: [Your Name]
I. General Information
-
Company: [Your Company Name]
-
Location: 1789 Prenter Rd., Seth, WV 25181
-
Weather Conditions:
-
Temperature: 75°F
-
Humidity: 60%
-
Wind: 5 mph NW
-
II. Personnel
A. Staff On Site
-
Engineers: 5
-
Foremen: 2
-
Laborers: 12
B. Subcontractors
-
McElroy Construction
-
JOY Electrical
-
WeSteel Inc.
III. Work Performed
Activities:
-
Poured concrete for the north abutment.
-
Erected steel beams for the main span.
-
Installed temporary scaffolding for the bridge deck.
IV. Equipment Utilized
Equipment |
Quantity |
Condition |
---|---|---|
Excavators |
2 |
Good |
Concrete Mixers |
3 |
Fair |
Steel Cranes |
1 |
Excellent |
V. Safety Measures
Safety Protocols Implemented:
-
All personnel are required to wear PPE.
-
Daily safety briefings are conducted before work begins.
-
The emergency response plan was reviewed with all staff.
VI. Issues and Delays
Summary of Issues:
-
Minor delay due to late material delivery.
-
Resolved equipment malfunction with Excavator #2.
-
Weather conditions caused a brief work stoppage.
VII. Additional Notes
All tasks are on schedule as per the project plan. Coordination with all the workers for the next phase of work is necessary to prevent future delays.