Renovation Shopping List

RENOVATION SHOPPING LIST

Prepared by: [Your Name]


We are excited to transform our kitchen into a modern, functional space that reflects our family's style and enhances daily living.


Materials and Supplies

Item

Quantity

Specifications

Lumber

20 pieces

2x4 studs, pine, 8 ft

Drywall

20 sheets

Gypsum board, 1/2 inch, fire-resistant

Flooring

200 sq ft

Ceramic tiles, 12x12 inches, non-slip surface

Paint

5 gallons

Interior latex, eggshell finish, VOC-free, low odor

Tiles

200 sq ft

Subway tiles, white, beveled edges

Plumbing Fixtures

1 unit

Single bowl stainless steel sink

Electrical Fixtures

10 units

LED recessed lights, dimmable, energy-efficient

Hardware

30 pieces

Cabinet handles, brushed nickel, rust-resistant

Tools

1 each

Cordless drill, circular saw, utility knife

Other

1 roll

Underlayment, adhesive, moisture-resistant


Budget and Costs

Item

Estimated Cost ($)

Actual Cost ($)

Lumber

$300

$320

Drywall

$400

$380

Flooring

$800

$820

Paint

$200

$210

Tiles

$600

$600

Plumbing Fixtures

$150

$160

Electrical Fixtures

$500

$520

Hardware

$100

$110

Tools

$150

$150

Other

$50

$50


Vendor Information

Item

Vendor

Contact Information

Price Quote ($)

Lumber

Lowe's

1-800-445-6937

$16 each

Drywall

Home Depot

1-800-466-3337

$20 each

Flooring

Floor & Decor

1-877-675-0002

$4 per sq ft

Paint

Sherwin-Williams

1-800-474-3794

$40 per gallon

Tiles

Tile Shop

1-888-398-6595

$3 per sq ft

Plumbing Fixtures

Ferguson

1-800-721-2590

$150 each

Electrical Fixtures

Lamps Plus

1-800-782-1967

$50 each

Hardware

Amazon

1-888-280-4331

$5 each

Tools

Lowe's

1-800-445-6937

$100 each

Other

Home Depot

1-800-466-3337

$50 per roll


Timeline

Item

Deadline

Purchase Lumber

July 15, 2050

Install Drywall

July 20, 2050

Finish Flooring

July 25, 2050

Complete Painting

July 28, 2050

Tile Installation

August 1, 2050

Fixture Installation

August 5, 2050

Hardware Installation

August 10, 2050

Tool Acquisition

July 10, 2050

Other

Schedule with contractor


Checklist for Moving Day

 Item

 Completed

Pack Essentials

  • Yes  

  • No

Arrange Movers

  • Yes  

  • No

Clean and Inspect

  • Yes  

  • No

Move Furniture

  • Yes  

  • No

Set Up Utilities

  • Yes  

  • No



List Templates @ Template.net