Manager Log Task List
Manager Log Task List
Prepared by: [Your Name]
Welcome to the Manager Log Task List designed to track construction milestones effectively. This checklist outlines key tasks across various phases of the construction project, ensuring organized progress tracking and milestone achievement. Use this log to monitor and manage the construction process from pre-planning to final inspections and commissioning.
Pre-Construction Planning:
Task to be done |
In Progress |
Done |
---|---|---|
Review project scope and objectives. |
|
|
Conduct initial site surveys and assessments. |
|
|
Develop preliminary budget and timeline. |
|
|
Obtain necessary permits and approvals. |
|
|
Foundation and Site Preparation:
Task to be done |
In Progress |
Done |
---|---|---|
Excavate and prepare foundation site. |
|
|
Install temporary utilities (if required). |
|
|
Pour and cure foundation concrete. |
|
|
Conduct soil testing and compaction. |
|
|
Structural Framing:
Task to be done |
In Progress |
Done |
---|---|---|
Erect structural steel or wood framing. |
|
|
Install roofing materials and sheathing. |
|
|
Complete framing inspections and approvals. |
|
|
Seal building envelope for weatherproofing. |
|
|
Mechanical, Electrical, Plumbing (MEP) Systems:
Task to be done |
In Progress |
Done |
---|---|---|
Install HVAC systems and ductwork. |
|
|
Rough-in plumbing and drainage systems. |
|
|
Install electrical wiring and fixtures. |
|
|
Conduct MEP inspections and testing. |
|
|
Interior Finishes:
Task to be done |
In Progress |
Done |
---|---|---|
Install insulation and drywall. |
|
|
Paint interior walls and ceilings. |
|
|
Install flooring materials (carpet, tile, etc.). |
|
|
Complete interior trim and finishes. |
|
|
Exterior Finishes:
Task to be done |
In Progress |
Done |
---|---|---|
Apply exterior siding and finishes. |
|
|
Install windows and exterior doors. |
|
|
Complete landscaping and site grading. |
|
|
Conduct final exterior inspections. |
|
|
Final Inspections and Commissioning:
Task to be done |
In Progress |
Done |
---|---|---|
Perform final building inspections and approvals. |
|
|
Test and commission MEP systems. |
|
|
Obtain occupancy permits and certificates. |
|
|
Conduct final walkthrough and punch list completion. |
|
|
Use this log to ensure each milestone is tracked and completed efficiently throughout the construction project. Adjust the "In Progress" and "Done" columns as each milestone is completed or progresses.