Free Exterior Punch List Template

Exterior Punch List

Prepared by: [Your Name] | Email: [Your Email]


A. Project Information

Project Name

[Project Name]

Project Address

Amherst, MA 01002

Client Name

Nichole Marshall

Client Contact

222 555 7777

Date of Inspection

July 1, 2054

Inspector Name

[Your Name]

B. Exterior Punch List

1. Site Work

Item

Description

Status

Comments

Assigned To

Grading and Drainage

Ensure proper drainage and grading

Incomplete

Standing water observed near the driveway

Mike Jones

Landscaping

Installation of sod and plants

In Progress

Missing shrubs in the front yard

Sarah Brown

Fencing

Repair damaged sections

Complete

-

Tom White

2. Exterior Surfaces

Item

Description

Status

Comments

Assigned To

Siding

Check for damages or missing pieces

Incomplete

Cracks on north side

Jim Green

Painting

Ensure even coverage and no peeling

In Progress

Touch-up needed on trim

Alice Smith

Stucco

Inspect for cracks or holes

Complete

-

Tom White

3. Roofing

Item

Description

Status

Comments

Assigned To

Shingles

Check for missing or damaged shingles

Incomplete

Missing shingles on the west side

Jim Green

Gutters

Ensure gutters are secure and clean

In Progress

Clogged downspouts

Mike Jones

Flashing

Verify proper installation

Complete

-

Sarah Brown

4. Windows and Doors

Item

Description

Status

Comments

Assigned To

Windows

Check for cracks or sealing issues

Incomplete

Broken window in the bedroom

Alice Smith

Doors

Ensure proper alignment and sealing

In Progress

Front door sticking

Mike Jones

Screens

Inspect for tears or holes

Complete

-

Tom White

5. Exterior Lighting

Item

Description

Status

Comments

Assigned To

Fixtures

Verify all fixtures are installed

Incomplete

Missing fixture on the porch

Jim Green

Wiring

Check for exposed or damaged wiring

In Progress

Loose wire on the back wall

Alice Smith

Bulbs

Ensure all bulbs are functioning

Complete

-

Sarah Brown

6. Driveway and Walkways

Item

Description

Status

Comments

Assigned To

Driveway

Inspect for cracks or damage

Incomplete

Large crack near the garage

Mike Jones

Walkways

Ensure even surface and no tripping hazards

In Progress

Uneven surface near the entrance

Alice Smith

Pavers

Check for loose or missing pavers

Complete

-

Tom White

C. Notes and Recommendations

  1. Ensure all incomplete and in-progress items are addressed before the final inspection.

  2. Schedule a follow-up inspection to verify the completion of all items.

  3. Maintain communication with assigned personnel to ensure timely resolution of issues.


[Your Company Name] appreciates your business and strives for excellence in every project. Please contact us at [Your Company Email] or [Your Company Number] for any further assistance.

List Templates @ Template.net