Printable Work Instruction
Work Instruction
Prepared by: [Your Name]
Approved by: Jane Smith
Department: Manufacturing
Location: [Your Company Address]
1. Purpose
The purpose of this Work Instruction is to provide detailed steps for the assembly of the ProVivo Product, ensuring consistency, safety, and quality in the manufacturing process.
2. Scope
This instruction applies to all operators involved in the assembly process of the ProVivo Product on Assembly Line 3.
3. Responsibilities
-
Operators: Follow the steps outlined in this Work Instruction.
-
Supervisors: Ensure operators are trained and compliant with this WI.
-
Quality Control (QC): Inspect the finished product to ensure it meets quality standards.
4. Materials and Equipment
-
Materials:
-
ProVivo Product components (A, B, C)
-
Screws (M4 x 10 mm)
-
Washers
-
Adhesive
-
-
Equipment:
-
Screwdriver
-
Torque wrench
-
Assembly fixture
-
Personal Protective Equipment (PPE)
-
5. Safety Precautions
-
Wear appropriate PPE, including safety glasses and gloves.
-
Ensure the workspace is clean and free of debris.
-
Follow all safety guidelines related to the operation of assembly equipment.
6. Procedure
6.1 Preparation
-
Check Materials: Verify that all components (A, B, C) are available and undamaged.
-
Set Up Workstation: Arrange tools and components in an ergonomic and organized manner.
6.2 Assembly Process
-
Step 1: Assemble Component A and B
-
Place Component A on the assembly fixture.
-
Align Component B with Component A.
-
Insert screws (M4 x 10 mm) through the aligned holes.
-
Tighten screws using the screwdriver to a snug fit.
-
Use the torque wrench to apply the specified torque of 5 Nm.
-
-
Step 2: Attach Component C
-
Apply adhesive to the specified area on Component B.
-
Position Component C on Component B, ensuring alignment with the marked guide.
-
Hold in place for 30 seconds to allow the adhesive to set.
-
-
Step 3: Install Washers
-
Place washers over the screws on Component A.
-
Verify that all washers are correctly seated.
-
6.3 Final Inspection
-
Visual Check: Inspect the assembled product for any visible defects or misalignments.
-
Torque Verification: Confirm that all screws are tightened to the specified torque of 5 Nm.
-
Record Results: Document the assembly completion in the production log.
7. Quality Control
-
Inspection Criteria:
-
All components are securely fastened.
-
No visible gaps or misalignments.
-
Adhesive is properly applied and cured.
-
-
Action on Non-Conformance:
-
If any defect is found, rework the assembly as per rework instructions (WI-002).
-
If rework is not possible, escalate the issue to the supervisor for further action.
-
8. Documentation
-
Production Log: Record the date, time, operator name, and any observations during assembly.
-
QC Report: Document the inspection results and any actions taken.
9. References
-
WI-002: Rework Instructions for ProVivo Product
-
MSDS: Material Safety Data Sheets for adhesive used
-
Assembly Drawing No.: AD-ProVivo-2055
10. Revision History
Version |
Date |
Description |
Author |
Reviewer |
---|---|---|---|---|
1.0 |
January 1, 2055 |
Initial release of Work Instruction |
[Your Name] |
Jane Smith |