Industrial Panel Schedule Format

Industrial Panel Schedule


General Information

  • Panel Name/ID: Main Distribution Panel (MDP-01)

  • Location: Electrical Room, Building A

  • Voltage: 480V

  • Phase: 3-Phase

  • Frequency: 60 Hz

  • Prepared By: [Your Name]

  • Date: September 25, 2054


Circuit Listings

Circuit No.

Description

Load (Amps)

Breaker Size (Amps)

Notes

1

Main Motor 1

20

30

Production line 1

2

General Lighting

10

15

Office and corridor

3

Main Motor 2

15

20

Production line 2

4

HVAC Unit

25

40

Cooling system

5

Emergency Lighting

5

10

Backup power supply

6

Pump 1

30

40

Water supply

7

Control Panel

8

15

Main controls

8

HVAC Control System

12

20

Temperature control

9

Power Outlet Circuit

10

15

Workshop outlets

10

Air Compressor

20

30

Compressed air supply


Summary of Load Calculations

  • Total Load (Amps): 150 Amps

  • Total Breaker Capacity (Amps): 265 Amps

  • Remaining Capacity: 115 Amps


Safety and Compliance Information

  • Grounding Method: Separate grounding system with ground rods

  • Compliance Standards: NEC (National Electrical Code), NEMA (National Electrical Manufacturers Association)

  • Inspection Date: August 10, 2054

  • Next Inspection Due: February 10, 2055


Additional Notes

  • Ensure all circuits are labeled clearly at the panel.

  • Regular maintenance checks should be scheduled quarterly.

  • Refer to the schematic diagram for wiring details located in the electrical room.