Yacht Panel Schedule
Yacht Panel Schedule
Vessel Name: Ocean Explorer
Date: June 5, 2051
Prepared by: [Your Name]
Email: [Your Email]
Electrical Panel Overview
Panel Name |
Location |
Voltage |
Load Type |
Description |
---|---|---|---|---|
Main Panel |
Engine Room |
230V |
AC |
Main distribution panel. |
Salon Panel |
Salon |
230V |
AC |
Powers salon lights and outlets. |
Galley Panel |
Galley |
230V |
AC |
Supplies galley appliances. |
Cabin 1 Panel |
Cabin 1 |
230V |
AC |
Lighting and outlets in Cabin 1. |
Cabin 2 Panel |
Cabin 2 |
230V |
AC |
Lighting and outlets in Cabin 2. |
Battery Charger |
Engine Room |
12V |
DC |
Charges DC battery system. |
Inverter Panel |
Engine Room |
230V |
AC |
Converts DC to AC for outlets. |
Emergency Panel |
Bridge |
230V |
AC |
Emergency lighting systems. |
Circuit Details
Circuit No. |
Load Description |
Cable Size |
Fuse Rating |
Status |
---|---|---|---|---|
1 |
Main engine starter |
10 mm² |
100A |
Active |
2 |
Salon lights |
1.5 mm² |
10A |
Active |
3 |
Refrigerator |
2.5 mm² |
16A |
Active |
4 |
Cabin 1 lights |
1.5 mm² |
10A |
Active |
5 |
Cabin 2 lights |
1.5 mm² |
10A |
Active |
6 |
Battery charger |
6 mm² |
N/A |
Active |
7 |
General power outlets |
10 mm² |
30A |
Active |
8 |
Emergency lighting |
2.5 mm² |
10A |
Standby |
Notes
-
Safety Precautions: Ensure all electrical work is conducted following maritime safety regulations.
-
Maintenance Schedule: Regular checks of panels and circuit integrity are recommended every six months.
-
Modifications: Any modifications to this schedule should be documented and reported to the electrical engineer.