Industrial Equipment Preventive Maintenance

Industrial Equipment Preventive Maintenance Schedule

This preventive maintenance schedule is designed to ensure that all industrial equipment operates efficiently and downtime is minimized. Each task is to be completed by the assigned personnel within the specified timeframe. Detailed inspection and maintenance procedures must be followed as per the equipment manuals.

Week

Equipment

Task

Assigned Personnel

Week 1
(Aug 1 - Aug 7)

Hydraulic Press

  • Inspect hydraulic fluid levels

  • Check for fluid leaks

  • Test pressure gauges

John Doe

Week 2
(Aug 8 - Aug 14)

Air Compressors

  • Inspect air filters

  • Check for air leaks

  • Lubricate moving parts

Mary Johnson

Week 3
(Aug 15 - Aug 21)

Conveyor Belts

  • Inspect belt tension

  • Check for belt wear and tear

  • Adjust alignment and tension if necessary

James Smith

Week 4
(Aug 22 - Aug 31)

Cooling Systems

  • Inspect coolant levels

  • Check for leaks in the system

  • Test thermostat operation

Emma Brown

Notes:

  • Please ensure all maintenance tasks are logged in the maintenance records after completion.

  • Any issues identified during inspections should be reported immediately to the maintenance supervisor.

  • Follow all safety protocols and wear appropriate PPE during maintenance procedures.