Free Plumbing Site Checklist Template
Plumbing Site Checklist
Prepared by: [YOUR NAME]
Date: [DATE]
Company: [YOUR COMPANY NAME]
The Plumbing Site Checklist is crucial for successful projects, ensuring compliance, safety, and integrity throughout each installation stage.
General Information
-
Project Name:
-
Location:
-
Date:
-
Inspector Name:
Pre-Installation
-
Verify all plumbing plans and specifications.
-
Confirm permits and approvals are obtained.
-
Ensure site conditions are suitable for plumbing work.
-
Review safety protocols with all crew members.
-
Check the availability of necessary tools and equipment.
Material Inspection
-
Confirm materials meet project specifications.
-
Inspect pipe materials (PVC, CPVC, PEX, copper, etc.) for defects.
-
Check fittings, valves, and fixtures for compliance.
-
Verify water heater and boiler specifications.
-
Ensure insulation materials are appropriate and available.
Underground Plumbing
-
Verify trench depth and width according to codes.
-
Inspect foundation drains and sump pumps.
-
Check for proper slope in drain lines (minimum 1/4" per foot).
-
Confirm the installation of cleanouts at specified intervals.
-
Ensure proper backfill of trenches and compaction.
Above Ground Plumbing
-
Confirm installation of water supply lines (hot and cold).
-
Inspect drainage systems for proper installation.
-
Verify venting systems are installed correctly.
-
Check for adequate support and spacing for all pipes.
-
Ensure accessibility for all fixtures and valves.
Fixture Installation
-
Inspect the installation of toilets, sinks, and showers.
-
Confirm proper sealing of fixtures.
-
Ensure installation of faucets and valves is secure.
-
Verify that all fixtures are level and plumb.
-
Check that water flow and drainage are functioning properly.
Safety Measures
-
Ensure personal protective equipment (PPE) is worn.
-
Confirm fire safety measures are in place.
-
Check for proper ventilation in work areas.
-
Inspect the site for hazards (tripping, falling, etc.).
-
Verify first aid kit is available and stocked.
Final Inspection
-
Confirm all work complies with local building codes.
-
Check for leaks in all connections and joints.
-
Test all fixtures and appliances for functionality.
-
Verify that shut-off valves are accessible and labeled.
-
Complete final documentation and sign off.