Civil Works Quality Checklist

CIVIL WORKS QUALITY CHECKLIST


 Prepared by:

[Your Name]

Email:

[Your Email]

 Date:

January 1, 2050


Introduction

This Civil Works Quality Checklist ensures the Oak Ridge Residential Development Project meets quality and safety standards, helping project teams verify construction activities comply with design and regulations.


Preliminary Checks

Item

Details

Permit Number

78032, Issued by: Regional Planning Department

Documents Available

Structural Plans, Site Plans, Utility Schematics

Contractor License Number

54231

Subcontractor License Number

99872


Site Preparation


Material Inspection

Item

Details

Material Type

C30 Ready-mix Concrete, Riverstone Supplies

Storage Area

Secured zones for lumber, steel beams, insulation

Materials Checked

Cement bags, Structural Steel, Waterproof Membranes


Foundation and Excavation

Item

Details

Excavation Depth & Width

  • Depth: 2.5m

  • Width: 6m,

  • Verified by Site Supervisor Jolie Cassin.

Shoring Type

  • Timber shoring

  • Checked by: Site Safety Officer, Rocky Orn

Foundation Progress

  • 70% complete,

  • Pending Task: Reinforcement bar placement


Concrete Works

Item

Details

Concrete Mix

  • 1:2:4 (Cement: Sand: Gravel)

  • Strength: 30 MPa

  • Batch Number: 98765

Reinforcement Placement

  • Rebar placement at 30cm intervals

  • Checked by: Structural Engineer, Lawrence Orn

Curing Method

  • Plastic sheeting

  • Curing Duration: 7 days for foundation walls


Structural Work

Item

Details

Steel Framing Installation

  • Steel beams and columns installed as per the layout

  • Verified by: Site Engineer, Trace Durgan

Alignment Check

Laser verification at 1m intervals, all components within 10mm tolerance

Welding/ Bolting

  • ASME IX welding standard

  • Welding Team Lead: Clint Renner


Utilities and Services

Item

Details

Plumbing

Copper pipes, and fixtures tested for leaks

Electrical

Conduits and cables laid, connections inspected

HVAC

Ducting and venting systems installed according to plans

Utility Testing

Plumbing and electrical tests passed successfully.


Finishes and Details

Item

Details

Wall Finish

Smooth plaster finish

Floor Finish

Vinyl tiles installed in corridors

Ceiling Finish

Gypsum boards with concealed lighting

Doors & Windows

Fire-rated timber doors, UPVC windows with double glazing

Paint/Tiling

Two coats of paint, porcelain tiles in bathrooms


Safety Compliance

Item

Details

PPE Compliance

  • Hard hats

  • Protective gloves

  • Safety glasses

  • Steel-toed boots

  • Hearing protection

Scaffolding/Ladders

  • 6m scaffolding secured with cross-braces

  • OSHA-approved ladders

Fire Extinguishers/First Aid Kits

  • 10 fire extinguishers

  • Checked and replenished first aid kits


Final Inspection

Item

Details

Code Compliance

National Building Code 2051, Electrical Code IEC 60364

System Testing

HVAC airflow tested, plumbing fixtures checked for leaks

Punch List

Touch-up painting, minor electrical fixture adjustments


End Note

This checklist ensures the Oak Ridge Project meets quality and compliance standards. The project team must follow guidelines for safety, efficiency, and quality, addressing any issues promptly for successful completion.


Checklist Templates @ Template.net