Introduction

The primary objective of this report is to present the findings of the construction survey conducted at the proposed site for the new residential complex. The survey aims to assess the site's suitability for construction, identify any potential challenges, and provide recommendations for proceeding with the development. This report is intended for stakeholders and decision-makers involved in the project.

Site Overview

The construction site is located at Boise, ID 83701. The total area of the site is approximately 50,000 square feet. The site is currently vacant and was previously used as a parking lot. The geographical coordinates are 40.7128° N, 74.0060° W.

Survey Objectives

Primary Objectives

  • Assess ground stability and composition.

  • Identify existing underground utilities.

  • Evaluate environmental impact factors.

  • Determine accessibility for construction equipment.

Secondary Objectives

  • Verify site dimensions and boundaries.

  • Identify any zoning restrictions or regulations.

Methodology

The survey was conducted over a two-week period, from September 1st to September 14th, 2053. The team utilized a combination of ground-penetrating radar, soil sampling, and topographic mapping to gather data. Additionally, consultations with local utility companies were undertaken to identify existing underground infrastructure.

Findings

Ground Stability and Composition

The soil composition predominantly consists of sandy loam, which is generally suitable for construction. However, a small section towards the northwest corner has a significant clay deposit, which may require soil stabilization before any foundation work can proceed.

Location

Soil Type

Stability Rating (1-10)

Northwest

Clay

7

Northeast

Sandy Loam

9

Southwest

Sandy Loam

8

Southeast

Sandy Loam with Silt

8

Existing Underground Utilities

The survey identified several underground utilities running beneath the site, including:

  • Gas Pipeline: Extends diagonally across the site.

  • Water Main: Located near the eastern boundary.

  • Telecommunication Lines: Present along the southern perimeter.

Coordination with respective utility companies is necessary to address any required rerouting or protective measures during construction.

Environmental Impact

Preliminary assessments indicate that the construction will have minimal impact on local wildlife. However, the presence of a small wetland area adjacent to the northeastern corner necessitates careful planning to avoid ecological disruption. An environmental impact assessment is recommended before commencing major construction activities.

Accessibility

The site is accessible via the main road, with an existing driveway that can accommodate construction equipment. However, improvements in signage and temporary road adjustments are suggested for better movement of materials and machinery.

Recommendations

Soil Stabilization

Implement soil stabilization techniques in the northwest corner to ensure foundation integrity. Options include soil nailing or the use of geotextiles.

Utility Coordination

Engage with local utility providers to discuss necessary rerouting or structural protection for identified utilities. Obtaining all relevant permits prior to construction will be essential.

Environmental Conservation

Conduct a full environmental impact assessment to inform any additional conservation measures needed. Consider the installation of protective barriers around the wetland area.

Construction Planning

Develop a detailed construction plan accounting for site accessibility, staging areas, and temporary traffic adjustments. Ensure this plan is communicated to all contractors and relevant agencies.

Conclusion

The construction survey has provided critical insights into the site's characteristics and potential challenges. With the implementation of the outlined recommendations, the site is deemed suitable for the proposed development. Ongoing assessment and coordination will be key to the project's successful completion.