Report Date: December 20, 2050
Facility Name: Greenfield Office Complex
Location: 123 Main Street, Springfield


1. Summary of Maintenance Activities

Date of Maintenance: December 18, 2050
Performed By: Facility Maintenance Team

  • Inspection Areas:

    • Electrical Systems

    • HVAC Systems

    • Plumbing

    • Structural Integrity

    • Safety Equipment

  • Maintenance Activities Completed:

    • Replaced faulty electrical wiring in the main hall.

    • Serviced HVAC units for optimal performance.

    • Cleared a blockage in the restroom plumbing.

    • Conducted a routine safety inspection of fire extinguishers.


2. Observations

  • Electrical Systems:
    Minor frayed wires were identified and replaced.

  • HVAC Systems:
    No major issues; filters were replaced, and units were cleaned.

  • Plumbing:
    Resolved a clog in the restroom sink; additional inspection for pipe wear is scheduled.

  • Structural Integrity:
    Small cracks were observed in the west wall; further evaluation is needed.

  • Safety Equipment:
    All fire extinguishers are operational and within inspection validity.


3. Recommendations

  1. Schedule a structural assessment for the west wall.

  2. Conduct bi-monthly HVAC servicing.

  3. Ensure consistent monitoring of plumbing for potential aging pipes.


4. Next Steps

  • Submit this report to the facility manager by December 22, 2050.

  • Schedule additional inspections for unresolved issues.

  • Plan the next maintenance cycle on January 15, 2051.