Free Fire Safety Maintenance Report Design Template
Fire Safety Maintenance Report Design
Report Date: December 20, 2050
Facility Name: Central Office Complex
Address: 123 Safety Lane, Metropolis, XY 56789
Prepared By: [Your Name]
Maintenance Team: FireGuard Safety Solutions
1. Overview of Fire Safety System
-
Fire Alarm System Type: Addressable Fire Alarm System
-
Fire Extinguishers Count: 50 units (ABC, CO2, Foam)
-
Sprinkler System Coverage: 100% facility coverage
-
Emergency Exits: 8 exits with illuminated signage
-
Smoke Detectors Count: 150 units across all floors.
-
Last Maintenance Date: November 15, 2050
2. Maintenance Activities Summary
Date |
Maintenance Type |
Description |
Cost |
---|---|---|---|
12/05/2050 |
Fire Alarm Inspection |
Tested all fire alarm panels and resolved minor wiring faults. |
$400 |
12/08/2050 |
Fire Extinguisher Servicing |
Refilled 20 extinguishers and replaced 5 outdated units. |
$600 |
12/12/2050 |
Sprinkler System Check |
Pressure-tested sprinkler pipes and replaced 2 faulty nozzles. |
$350 |
12/15/2050 |
Emergency Exit Lighting Test |
Replaced 3 broken exit light fixtures and tested backup power. |
$250 |
12/18/2050 |
Smoke Detector Calibration |
Calibrated 30 smoke detectors for sensitivity accuracy. |
$300 |
3. Issues Identified and Actions Taken
Issue |
Date Reported |
Action Taken |
Cost |
---|---|---|---|
Faulty Sprinkler Nozzles |
12/05/2050 |
Replaced 2 nozzles to restore proper function. |
$150 |
Outdated Fire Extinguishers |
12/08/2050 |
Replaced 5 units with new extinguishers. |
$450 |
Broken Exit Light Fixtures |
12/12/2050 |
Replaced and tested for illumination. |
$250 |
4. Parts Replaced
Part |
Part Number |
Date Replaced |
Cost |
---|---|---|---|
Fire Extinguisher (ABC Type) |
FE-ABC-10LB |
12/08/2050 |
$90 each |
Sprinkler Nozzle |
SPN-100 |
12/12/2050 |
$75 each |
Emergency Exit Light Fixture |
EXL-LED-120 |
12/15/2050 |
$120 each |
5. Inspection Results
System Component |
Status |
Comments |
---|---|---|
Fire Alarm System |
Fully Operational |
Wiring faults resolved; alarms tested. |
Fire Extinguishers |
Fully Stocked |
20 refilled; 5 replaced. |
Sprinkler System |
Fully Operational |
Pressure stable; no leaks detected. |
Emergency Exit Lighting |
Operational |
3 fixtures were replaced; backup power was tested. |
Smoke Detectors |
Fully Functional |
All detectors were calibrated and tested. |
6. Compliance and Safety Checks
-
Fire Safety Standards Met:
-
NFPA 72 (National Fire Alarm Code)
-
NFPA 10 (Standard for Portable Fire Extinguishers)
-
NFPA 13 (Standard for Sprinkler Systems)
-
-
Evacuation Routes Checked:
-
All routes are clear and marked with updated signage.
-
-
Drill Conducted:
-
The fire drill was completed on December 15, 2050.
-
7. Recommendations for Next Steps
-
Schedule quarterly fire alarm inspections for consistent reliability.
-
Replace any extinguishers nearing expiration by February 2051.
-
Conduct a sprinkler system flush to maintain optimal flow efficiency.
-
Ensure periodic fire safety drills to keep staff prepared.
8. Maintenance Costs Summary
Category |
Cost |
---|---|
Fire Alarm Maintenance |
$400 |
Extinguisher Servicing |
$600 |
Sprinkler System Maintenance |
$350 |
Exit Lighting Repairs |
$250 |
Smoke Detector Calibration |
$300 |
Total |
$1,900 |
Report Prepared By:
[Your Name]
Fire Safety Specialist
FireGuard Safety Solutions