Free School Maintenance Report Template

School Maintenance Report


Report Date: December 20, 2050
School Name: Greenfield High School
Address: 456 Scholars Drive, Metropolis, XY 56789
Prepared By: [Your Name]
Maintenance Team: Greenfield Facilities Services


1. Introduction

This School Maintenance Report provides an overview of the maintenance activities carried out at Greenfield High School in December 2050. It outlines the tasks performed to maintain the school’s infrastructure, ensure a safe environment for students and staff, and address any issues identified during the maintenance process. The purpose of this report is to keep school administration informed of maintenance progress, the status of school facilities, and provide recommendations for future maintenance actions.


2. Maintenance Activities Summary

Table 1: Maintenance Tasks Performed

Date

Area/Zone

Task Performed

Description

Status

12/02/2050

Classrooms (A, B, C)

Desk & Chair Repair

Repaired and replaced broken desks and chairs.

Completed

12/05/2050

Hallways & Stairwells

Floor Cleaning & Rewaxing

Deep cleaned floors and applied new wax coating.

Completed

12/08/2050

Restrooms (All Floors)

Plumbing Inspection & Fixture Repair

Inspected and repaired broken faucets and sinks.

Completed

12/10/2050

Library

Bookshelf Organization & Deep Cleaning

Reorganized shelves and cleaned carpets and windows.

Completed

12/12/2050

Gymnasium

Equipment Maintenance & Floor Polishing

Inspected gym equipment and polished wooden flooring.

Completed


Table 2: Maintenance Tasks Performed

Date

Area/Zone

Task Performed

Description

Status

12/14/2050

Cafeteria

Equipment Servicing & Deep Cleaning

Cleaned kitchen appliances and deep cleaned dining area.

Completed

12/16/2050

Playground

Safety Inspection & Equipment Repair

Checked playground equipment for safety and repaired damaged parts.

Completed

12/18/2050

Administrative Offices

HVAC System Check & Filter Replacement

Checked HVAC systems and replaced filters.

Completed

12/20/2050

Auditorium

Lighting & Sound System Inspection

Inspected lighting and sound systems for functionality.

Completed


3. Issues Identified and Actions Taken

Issue

Date Reported

Action Taken

Status

Comments

Broken Faucets in Restrooms

12/08/2050

Repaired faucets in restrooms on all floors.

Resolved

All faucets are now in working order.

Worn Gymnasium Flooring

12/10/2050

Polished and cleaned gymnasium flooring.

Resolved

Flooring is now smooth and shiny.

Flickering Lights in Classrooms (B & C)

12/05/2050

Replaced bulbs and repaired fixtures.

Resolved

Lighting is now consistent and bright.

Playground Equipment Safety Concerns

12/16/2050

Repaired damaged swing and secured loose bolts.

Resolved

Playground is now fully safe.


4. Materials Used

Material/Tool

Quantity Used

Cost

Date Used

Desk and Chair Repair Kits

3 kits

$120

12/02/2050

Floor Wax

5 gallons

$80

12/05/2050

Plumbing Fixtures

10 pieces

$200

12/08/2050

Carpet Cleaning Solution

2 gallons

$40

12/10/2050

Gym Equipment Repair Parts

4 pieces

$60

12/12/2050

HVAC Filters

3 filters

$45

12/18/2050

Playground Equipment Parts

2 parts

$50

12/16/2050


5. Safety and Compliance Checks

  • Fire Safety: All fire exits and extinguishers were checked and found to be in good working order. Fire drills have been scheduled for the next month.

  • Electrical Safety: No issues were found with the electrical systems. All light fixtures and outlets are up to code.

  • HVAC Compliance: HVAC system is functioning within the required safety parameters. Filters have been replaced as per schedule.


6. Recommendations for Future Maintenance

  • Routine Plumbing Checks: Schedule regular plumbing inspections every 3 months to ensure no further leaks or blockages occur.

  • Classroom Furniture Replacement: Consider replacing worn-out desks and chairs in classrooms on a rotating basis.

  • Gym Flooring Maintenance: Plan for periodic refinishing of gymnasium floors every 6 months to preserve its appearance and safety.

  • Playground Equipment Inspection: Conduct a quarterly safety inspection of all playground equipment to ensure it remains in good condition.

  • HVAC System Servicing: Continue with bi-annual servicing of the HVAC system to maintain comfort and efficiency.


7. Maintenance Costs Summary

Category

Cost

Desk & Chair Repair

$120

Floor Waxing & Cleaning

$80

Plumbing Fixtures

$200

Carpet & Upholstery Cleaning

$40

Gym Equipment Repair

$60

HVAC Filters Replacement

$45

Playground Equipment Repair

$50

Total Maintenance Cost

$595


8. Conclusion

The maintenance activities for Greenfield High School have been successfully completed, ensuring that all facilities are clean, safe, and in good working condition. The tasks focused on improving classroom functionality, maintaining common areas, and ensuring safety standards. The identified issues were addressed promptly, and necessary repairs were completed. The school is now fully prepared for the new semester. Future maintenance will focus on keeping facilities in top condition through scheduled inspections and servicing.