Addendum Design
ADDENDUM DESIGN
Introduction
The purpose of this addendum is to document the changes and updates made to the design of Project XYZ. This document serves to outline modifications, provide revised drawings, and analyze the impact of these changes on the project. It is intended for use by all stakeholders, including project managers, engineers, and regulatory bodies.
Reference Information
Reference ID |
Document Name |
Version |
Date |
Author |
---|---|---|---|---|
REF12345 |
Original Project Plan |
1.0 |
2050-01-01 |
[Your Name] |
REF12346 |
Environmental Impact Assessment |
1.0 |
2050-02-15 |
Jane Smith |
REF12347 |
Technical Specifications |
1.0 |
2050-03-10 |
Michael Johnson |
Description of Changes
The following changes have been made to the original design of Project XYZ:
-
Modification of building elevation to meet new regulatory standards.
-
Inclusion of additional green spaces in the site plan as per environmental sustainability guidelines.
-
Upgrade of electrical systems to ensure compliance with the latest safety regulations.
Revised Drawings/Plans
Drawing/Plan ID |
Description |
Version |
Revision Date |
Prepared By |
---|---|---|---|---|
DRG56789 |
Building Elevation Plan |
2.0 |
2050-04-01 |
Architectural Team |
DRG56790 |
Site Plan - Green Spaces |
2.0 |
2050-04-05 |
Landscaping Team |
DRG56791 |
Electrical Systems Layout |
2.0 |
2050-04-10 |
Electrical Engineering Team |
Impact Analysis
The changes described in this addendum are expected to have the following impacts on the project:
-
Cost: An estimated increase in project cost by 5% due to the incorporation of additional green spaces and upgraded electrical systems.
-
Timeline: An extension of the project timeline by two months to accommodate design modifications and regulatory approvals.
-
Regulatory Compliance: Ensures full compliance with the latest building and safety regulations, reducing potential delays and penalties.
-
Environmental Impact: Positive impact by enhancing sustainability and green space within the project site.
Approval Section
By signing below, the undersigned approve the changes as documented in this addendum.
[Your Name]
Project Manager
[DATE SIGNED]
Jane Smith
Regulatory Compliance Officer
[DATE SIGNED]
Michael Johnson
Chief Engineer
[DATE SIGNED]