Introduction

The purpose of this addendum is to document the changes and updates made to the design of Project XYZ. This document serves to outline modifications, provide revised drawings, and analyze the impact of these changes on the project. It is intended for use by all stakeholders, including project managers, engineers, and regulatory bodies.


Reference Information

Reference ID

Document Name

Version

Date

Author

REF12345

Original Project Plan

1.0

2050-01-01

[Your Name]

REF12346

Environmental Impact Assessment

1.0

2050-02-15

Jane Smith

REF12347

Technical Specifications

1.0

2050-03-10

Michael Johnson


Description of Changes

The following changes have been made to the original design of Project XYZ:

  • Modification of building elevation to meet new regulatory standards.

  • Inclusion of additional green spaces in the site plan as per environmental sustainability guidelines.

  • Upgrade of electrical systems to ensure compliance with the latest safety regulations.


Revised Drawings/Plans

Drawing/Plan ID

Description

Version

Revision Date

Prepared By

DRG56789

Building Elevation Plan

2.0

2050-04-01

Architectural Team

DRG56790

Site Plan - Green Spaces

2.0

2050-04-05

Landscaping Team

DRG56791

Electrical Systems Layout

2.0

2050-04-10

Electrical Engineering Team


Impact Analysis

The changes described in this addendum are expected to have the following impacts on the project:

  • Cost: An estimated increase in project cost by 5% due to the incorporation of additional green spaces and upgraded electrical systems.

  • Timeline: An extension of the project timeline by two months to accommodate design modifications and regulatory approvals.

  • Regulatory Compliance: Ensures full compliance with the latest building and safety regulations, reducing potential delays and penalties.

  • Environmental Impact: Positive impact by enhancing sustainability and green space within the project site.


Approval Section

By signing below, the undersigned approve the changes as documented in this addendum.