Free SBAR Printout Design Template

SBAR Printout Design


Prepared by: [Your Name]


I. Situation

Subject: Urgent Maintenance Required for Office HVAC System

Description:

The HVAC system at our company's office, situated at [Your Company Address], has been failing to maintain the required temperature levels since last Friday, causing staff discomfort and potentially affecting sensitive equipment.

Date of Occurrence: August 22, 2050

Priority: High


II. Background

The HVAC system, installed in 2045, has been serviced regularly. However, recent reports indicate that it has been experiencing intermittent failures. The last service was conducted in June 2050, and no major issues were reported at that time. Maintenance logs suggest the system is due for an extensive review and possible upgrades.

Previous Issues:

Date

Issue Reported

Action Taken

June 10, 2050

Minor temperature fluctuations

Recalibrated system

January 15, 2050

Reduced airflow

Replaced filters


III. Assessment

Current Impact:

The malfunctioning HVAC system is causing fluctuations in office temperature, which could potentially impact employee productivity and equipment performance. There are concerns about possible further degradation if the issue is not addressed promptly.

Potential Risks:

  1. Employee Discomfort: Prolonged exposure to inconsistent temperatures may affect staff well-being.

  2. Equipment Damage: Sensitive electronic equipment may be damaged due to temperature fluctuations.

  3. Increased Costs: A delay in addressing the issue might lead to more expensive repairs or system replacements.

Recommended Action:

Immediate inspection by a certified HVAC technician to assess and rectify the issue. Consideration of system upgrade options may also be necessary.


IV. Recommendation

Action Plan:

Task

Responsible Party

Deadline

Schedule inspection

Facilities Management

August 23, 2050

Conduct system assessment

HVAC Technician

August 24, 2050

Implement repairs or upgrades

HVAC Technician

August 25, 2050

Confirm system functionality

Facilities Management

August 26, 2050

Follow-Up:

Post-repair review and system performance monitoring for one month to ensure issues are resolved and prevent recurrence.