Filter by:

Addendum Format

Addendum Format


Title: High-Efficiency Solar Panel System Specifications

Addendum Number: ADD-001

Effective Date: August 8, 2055

Document Reference: "High-Efficiency Solar Panel System Specifications," Version 1.2, dated June 15, 2050


1. Introduction

This Addendum serves to update and provide additional technical details to the existing document titled “High-Efficiency Solar Panel System Specifications” (Version 1.2, dated June 15, 2050). The modifications and additional information detailed herein aim to clarify and enhance the technical accuracy and completeness of the original document.


2. Background

The original document outlined the technical specifications and procedures for the High-Efficiency Solar Panel System. Since its publication, several updates and additional technical details have emerged, necessitating this Addendum to ensure the document remains current and accurate.


3. Additional Technical Details

The following sections include the new and updated technical information:

Section

Original Information

Updated Information

Section 4.2: Operating Conditions

Max temperature: 70°C

Max temperature: 80°C

Section 5.1: Component Specifications

Model: Z-100

Model: Z-200

Section 6.3: Installation Procedures

Step 3: Use a torque wrench

Step 3: Use a calibrated torque wrench with a 15% tolerance


4. Corrections

The following corrections have been made to rectify inaccuracies in the original document:

Section

Original Text

Corrected Text

Section 7.4: Power Requirements

Voltage: 110V

Voltage: 220V

Section 8.2: Calibration Procedure

Calibration range: 10-50mA

Calibration range: 20-60mA


5. Additional Data

New data provided for enhanced technical performance and compliance:

Performance Metrics:

  • Efficiency Improvement: 12% over the previous model

  • Lifetime Expectancy: Extended to 8 years

Safety Features:

  • Added thermal cutoff switch

  • Enhanced EMI shielding


6. Revised Diagrams and Illustrations

The following diagrams and illustrations have been updated to reflect the new information:

  • Diagram 3: Updated layout of component connections.

  • Figure 4: Revised calibration chart with new tolerance levels.


7. Implementation

The changes outlined in this Addendum should be implemented immediately. All relevant teams are requested to update their records and procedures accordingly.


8. Acknowledgements

For any queries regarding this Addendum, please contact the undersigned:

  • Prepared by: [Your Name], Senior Engineer

  • Email: [Your Email]

  • Date: August 8, 2055


9. Contact Information

For further information or support, please contact:

  • Company Name: [Your Company Name]

  • Email: [Your Company Email]

  • Address: [Your Company Address]

  • Phone: [Your Company Number]

  • Website: [Your Company Website]

  • Social Media: [Your Company Social Media]


This Addendum is issued to ensure all relevant parties are informed of the updates and modifications to the existing technical documentation. Compliance with the revised information is mandatory.

Addendum Templates @ Template.net