Free Addendum Format Template
Addendum Format
Title: High-Efficiency Solar Panel System Specifications
Addendum Number: ADD-001
Effective Date: August 8, 2055
Document Reference: "High-Efficiency Solar Panel System Specifications," Version 1.2, dated June 15, 2050
1. Introduction
This Addendum serves to update and provide additional technical details to the existing document titled “High-Efficiency Solar Panel System Specifications” (Version 1.2, dated June 15, 2050). The modifications and additional information detailed herein aim to clarify and enhance the technical accuracy and completeness of the original document.
2. Background
The original document outlined the technical specifications and procedures for the High-Efficiency Solar Panel System. Since its publication, several updates and additional technical details have emerged, necessitating this Addendum to ensure the document remains current and accurate.
3. Additional Technical Details
The following sections include the new and updated technical information:
Section |
Original Information |
Updated Information |
---|---|---|
Section 4.2: Operating Conditions |
Max temperature: 70°C |
Max temperature: 80°C |
Section 5.1: Component Specifications |
Model: Z-100 |
Model: Z-200 |
Section 6.3: Installation Procedures |
Step 3: Use a torque wrench |
Step 3: Use a calibrated torque wrench with a 15% tolerance |
4. Corrections
The following corrections have been made to rectify inaccuracies in the original document:
Section |
Original Text |
Corrected Text |
---|---|---|
Section 7.4: Power Requirements |
Voltage: 110V |
Voltage: 220V |
Section 8.2: Calibration Procedure |
Calibration range: 10-50mA |
Calibration range: 20-60mA |
5. Additional Data
New data provided for enhanced technical performance and compliance:
Performance Metrics:
-
Efficiency Improvement: 12% over the previous model
-
Lifetime Expectancy: Extended to 8 years
Safety Features:
-
Added thermal cutoff switch
-
Enhanced EMI shielding
6. Revised Diagrams and Illustrations
The following diagrams and illustrations have been updated to reflect the new information:
-
Diagram 3: Updated layout of component connections.
-
Figure 4: Revised calibration chart with new tolerance levels.
7. Implementation
The changes outlined in this Addendum should be implemented immediately. All relevant teams are requested to update their records and procedures accordingly.
8. Acknowledgements
For any queries regarding this Addendum, please contact the undersigned:
-
Prepared by: [Your Name], Senior Engineer
-
Email: [Your Email]
-
Date: August 8, 2055
9. Contact Information
For further information or support, please contact:
-
Company Name: [Your Company Name]
-
Email: [Your Company Email]
-
Address: [Your Company Address]
-
Phone: [Your Company Number]
-
Website: [Your Company Website]
-
Social Media: [Your Company Social Media]
This Addendum is issued to ensure all relevant parties are informed of the updates and modifications to the existing technical documentation. Compliance with the revised information is mandatory.