Fuse Board Schedule
Fuse Board Schedule
Prepared by: [YOUR NAME]
Location: Main Electrical Room
Fuse ID |
Location |
Rating(Amps) |
Purpose |
Notes |
---|---|---|---|---|
F1 |
Ground Floor |
20 |
Lighting Circuit 1 |
|
F2 |
Ground Floor |
20 |
Lighting Circuit 2 |
|
F3 |
Ground Floor |
30 |
Power Outlets |
|
F4 |
First Floor |
20 |
Lighting Circuit 1 |
|
F5 |
First Floor |
30 |
Lighting Circuit 2 |
|
F6 |
Second Floor |
20 |
Lighting Circuit 1 |
|
F7 |
Second Floor |
20 |
Lighting Circuit 2 |
|
F8 |
Basement |
15 |
Utility Room |
Lights and Outlets |
F9 |
Basement |
20 |
Basement Outlets |
Notes:
-
All ratings are in amperes (A).
-
Fuse ratings should match the corresponding circuit requirements.
-
Regular inspections and maintenance are recommended to ensure the integrity of the electrical system.
-
Any modifications to the electrical system should be performed by a qualified electrician in compliance with local regulations.