Free Construction Daily Quality Report Template
Construction Daily Quality Report
I. Date and Project Information
-
Date: June 20, 2050
-
Project Name: Maple Residences
-
Location: 139 South St., Littleton, NH 03561
-
Reported By: [YOUR NAME], Site Engineer
-
Client: [CLIENT NAME]
II. Weather Conditions
-
Temperature: 75°F
-
Humidity: 60%
-
Wind Speed: 5 mph
-
Weather Description: Partly cloudy with light winds
III. Summary of Work Performed
A. Activities Conducted
-
Foundation Work
-
Completed pouring concrete for the foundation of Building A.
-
Inspected the formwork before pouring.
-
-
Framing
-
Began framing the first floor of Building B.
-
Verified alignment and dimensions of the wooden frames.
-
-
Electrical Installation
-
Installed electrical conduits in Building C.
-
Checked compliance with safety standards.
-
B. Personnel On-Site
Role |
Number of Workers |
Tasks |
---|---|---|
Site Engineer |
1 |
Supervising overall site activities |
Construction Workers |
20 |
Performing foundation and framing |
Electricians |
5 |
Installing electrical systems |
IV. Inspections and Tests Conducted
Inspection/Test |
Conducted By |
Results |
Actions Taken |
---|---|---|---|
Foundation Inspection |
[YOUR NAME], Site Engineer |
Passed |
N/A |
Framing Inspection |
[QC MANAGER NAME], QC Manager |
Alignment Verified |
N/A |
Electrical Inspection |
[ELECTRICIAN NAME], Electrician |
Compliant |
N/A |
V. Materials Used
Material |
Quantity Used |
Supplier |
Quality Check Result |
---|---|---|---|
Concrete |
50 cubic yards |
iConcrete Co. |
Passed |
Wooden Frames |
100 units |
BEST Lumbers |
Passed |
Electrical Conduits |
200 feet |
Fine Electrics |
Passed |
VI. Quality Issues Identified
A. Description of Issues
-
Minor crack observed in the foundation of Building A.
-
Crack size: 2mm
-
-
Misalignment in the framing of Building B.
-
Deviation: 1.5 inches
-
B. Corrective Actions Taken
-
The foundation crack was filled with epoxy resin and re-inspected.
-
Framing misalignment was corrected by adjusting the frames and re-verifying dimensions.
VII. Signatures of Responsible Personnel
[YOUR NAME], Site Engineer
Date: [DATE SIGNED]
[QC MANAGER NAME], Quality Control Manager
Date: [DATE SIGNED]
[CLIENT REPRESENTATIVE NAME], Client Representative
Date: [DATE SIGNED]
This report comprehensively covers the daily activities, inspections, and quality checks performed on June 20, 2050, for the Maple Residences project. It ensures that the construction work meets the required standards and promptly addresses any issues identified.