Root Cause Investigation Report

Root Cause Investigation Report

Prepared by: [Your Name]

Date: January 3, 2051

I. Executive Summary

This Root Cause Investigation Report investigates the incident that occurred on January 1, 2051, at [Your Company Name]. The objective is to identify the root cause and propose corrective actions to prevent future occurrences.

II. Incident Overview

1. Incident Description

On the morning of January 1, 2051, a significant system outage occurred, affecting the entire production line. The outage lasted for 4 hours, resulting in substantial downtime and financial loss.

2. Impact and Consequences

The outage disrupted operations, resulting in a production halt. The estimated financial impact is $500,000, including lost revenue and overtime labor costs.

III. Investigation Team

1. Team Members

Name

Role

Contact

John Doe

Lead Investigator

[email protected]

Alice Smith

System Analyst

[email protected]

Michael Johnson

Engineer

[email protected]

2. Roles and Responsibilities

The investigation team is tasked with data collection, root cause analysis, and developing corrective actions.

IV. Root Cause Analysis

1. Methodology

The team employed the 5 Whys technique and Fishbone Diagram to identify the root cause of the incident.

2. Findings

Cause

Analysis

Power Surge

A power surge disrupted the main server, leading to the outage.

Inadequate Surge Protection

The existing surge protection failed to mitigate the power surge.

Outdated Equipment

Surge protection equipment had not been updated in 10 years.

3. Root Cause

The primary root cause identified was the failure of the inadequate and outdated surge protection system, which could not handle the unexpected power surge.

V. Corrective Actions

1. Short-term Actions

Immediate replacement of the surge protection system and inspection of all related equipment within the next 30 days.

2. Long-term Actions

Implement a maintenance schedule for regular inspection and replacement of critical equipment every 5 years.

Action

Owner

Due Date

Replace Surge Protection System

James Lee

February 3, 2051

Schedule Regular Inspections

Linda Green

March 1, 2051

Update Maintenance Protocol

David Brown

April 15, 2051

VI. Conclusion

This investigation revealed critical gaps in our surge protection system and maintenance protocols. By implementing the recommended corrective actions, [Your Company Name] will strengthen its operational resilience and mitigate future risks.

VII. Recommendations

Conduct an annual review of all critical systems and ensure all equipment is up-to-date with current standards.

For further details or inquiries about this report, please contact [Your Name] at [Your Email].

Report Templates @ Template.net