Electrical Panel Schedule
Electrical Panel Schedule
Prepared By: [Your Name]
Company: [Your Company Name]
Date: September 25, 2050
Panel Information
Field |
Details |
---|---|
Panel Name: |
Main Electrical Panel |
Panel Location: |
Basement Utility Room |
Panel Voltage: |
240V |
Circuit Details
Circuit No. |
Breaker Size (Amps) |
Load Description |
Connected Equipment |
Load (kW) |
---|---|---|---|---|
1 |
15 |
Lighting Circuits |
LED Recessed Lights (Living Room) |
1.2 |
2 |
20 |
General Outlets |
Outlets (Bedroom 1 & 2, Hallway) |
2.5 |
3 |
30 |
HVAC System |
Air Conditioning Unit (1.5 Ton) |
5.0 |
4 |
20 |
Kitchen Appliances |
Refrigerator, Microwave, Toaster |
3.0 |
5 |
40 |
Water Heating |
Electric Water Heater (30 Gallon) |
4.0 |
6 |
15 |
Emergency Lighting |
Exit Signs (Main & Back Exit) |
0.5 |
7 |
20 |
IT Equipment |
Servers, Network Switches |
3.0 |
8 |
50 |
Electric Vehicle Charger |
Level 2 EV Charging Station (Tesla Charger) |
6.0 |
9 |
15 |
Outdoor Lighting |
Landscape & Security Lights (Front Yard) |
1.0 |
10 |
30 |
Workshop Equipment |
Power Tools (Drill, Saw, etc.) |
2.0 |
Additional Circuit Information
-
Load Type: Continuous for HVAC and Water Heating; Non-Continuous for all others.
-
Voltage Rating: All equipment is rated at 240V unless specified.
-
Type of Circuit: Dedicated Circuit for Water Heating and EV Charger; Multi-wire Branch Circuit for Kitchen Appliances.
Summary
-
Total Load (kW): 28.2 kW
-
Total Circuit Breaker Size (Amps): 220 Amps
-
Total Number of Circuits: 10
Safety and Compliance Information
-
National Electrical Code (NEC) Compliance: Yes
-
Local Code Compliance: Yes
-
Last Inspection Date: June 15, 2050
-
Next Scheduled Inspection: June 15, 2051
Contact Information
[Your Name]
Email: [Your Email]
Phone: [Your Company Number]