Free Solar Power Design Panel Schedule Template
Solar Power Design Panel Schedule
Project Information
-
Project Name: Sunnyvale Solar Installation
-
Location: 123 Solar Lane, Sunnyvale, CA
-
Date: September 25, 2054
-
Prepared By: [Your Name]
-
Contact Information: [Your Email]
System Overview
-
Total System Size: 50 kW
-
Total Number of Panels: 150
-
System Type: Grid-Tied
-
Inverter Type: String Inverter
Panel Specifications
Panel Model |
Manufacturer |
Quantity |
Rated Power (W) |
Mounting Type |
---|---|---|---|---|
SunPower SPR-320 |
SunPower Corp. |
75 |
320 |
Fixed Rack |
LG NeON R 350 |
LG Electronics |
30 |
350 |
Fixed Rack |
Canadian Solar CS3K-325 |
Canadian Solar Inc. |
45 |
325 |
Fixed Rack |
Electrical Specifications
Parameter |
Value |
---|---|
Total DC Output Power |
50 kW |
Total AC Output Power |
45 kW |
System Voltage |
480 V |
Inverter Efficiency |
98% |
Expected Annual Energy Production |
80,000 kWh/year |
Wiring and Connections
Cable Type |
Size (AWG) |
Length (m) |
Quantity |
Notes |
---|---|---|---|---|
Solar PV Wire |
10 |
100 |
10 |
UV resistant |
DC Conductor |
6 |
50 |
5 |
For inverter connections |
AC Conductor |
4 |
30 |
3 |
For grid connection |
Safety and Compliance
-
Standards Compliance: UL 61730, IEC 61215
-
Safety Features: Surge protection devices, grounding system, and circuit breakers included.
Notes
-
Site Considerations: Installation on a flat roof with minimal shading from nearby trees. Regular maintenance checks are recommended for optimal performance.
-
Installation Timeline: Expected installation duration is 4 weeks, starting from October 15, 2054.