Free Construction Progress Site Visit Report Template

CONSTRUCTION PROGRESS SITE VISIT REPORT


Project Name: Horizon Tower
Date of Visit: December 18, 2054
Time of Visit: 10:00 AM
Prepared by: [Your Name]
Position: Project Manager


1. Introduction

This report provides a summary of the construction site visit conducted on December 18, 2054, for the Horizon Tower project located at 45 Oak Avenue. The purpose of this visit was to assess the progress of the construction work, review quality standards, identify any safety concerns, and provide recommendations for resolving any issues.


2. Objectives of Site Visit

  • Assess the current progress of the construction work.

  • Ensure work is in accordance with the approved plans and specifications.

  • Identify any deviations from the schedule or quality standards.

  • Document safety concerns or potential risks.

  • Provide recommendations for necessary corrective actions.


3. Site Observations

3.1 Work Progress

  • General Progress: The project is approximately 65% complete. The foundation and basement levels have been completed, and the first 5 floors of the building structure have been erected.

  • Work Completed:

    • Concrete foundation and underground utilities installation completed.

    • Erection of structural steel for floors 1 to 5 completed.

    • Electrical and plumbing rough-ins for floors 1 and 2 completed.

  • Ongoing Work:

    • Erection of structural steel for floors 6 and 7 is in progress.

    • MEP (Mechanical, Electrical, Plumbing) installation continues on floors 3 and 4.

    • Exterior wall cladding installation has begun on floor 4.

  • Work Pending:

    • Installation of windows and doors for floors 3 and 4.

    • Interior drywall installation for floors 3 and 4.

    • Landscaping and exterior finishing tasks.

3.2 Quality of Work

  • The structural steelwork and concrete foundations meet the design specifications.

  • The MEP rough-ins appear to be in alignment with the approved plans, but further inspection is required to ensure proper integration with the rest of the building systems.

  • The exterior wall cladding installation is slightly behind schedule but is progressing well.

3.3 Safety and Site Conditions

  • Safety Measures: The site is equipped with proper PPE for workers, and safety barriers are installed around high-risk areas.

  • Safety Concerns:

    • A few workers were observed not wearing helmets on the lower floors. A reminder of safety protocols should be issued to all workers.

    • There are scattered materials on the walkways, posing a trip hazard. Immediate clean-up is needed to maintain safe access routes.

  • Site Condition: The site is generally well-organized, with clear pathways and areas for material storage. However, the accumulation of excess materials near the work zone is reducing available space for operations.

3.4 Equipment and Materials

  • All major construction equipment (cranes, forklifts) are operational, though a few smaller tools are showing signs of wear.

  • Material delivery has been consistent; however, the delivery of drywall and glass windows is running behind schedule, which could affect the interior work on the higher floors.

3.5 Workforce

  • Workforce Observations: Approximately 80 workers were on-site during the visit. The workforce includes a mix of laborers, electricians, plumbers, and welders.

  • Efficiency: Most workers are operating efficiently, but there have been minor delays in tasks due to a shortage of skilled labor for the exterior cladding installation.


4. Issues and Challenges

  • Delay in Material Delivery: The delayed delivery of drywall and windows may impact the project schedule, especially for interior finishes.

  • Safety Non-Compliance: A few workers were observed not adhering to helmet safety protocols.

  • Site Congestion: There is excess material storage around the site, particularly near high-traffic areas, causing congestion and increasing the risk of accidents.


5. Action Items and Recommendations

  • Material Delivery: Coordinate with suppliers to expedite the delivery of drywall and windows to prevent delays in finishing work.

  • Safety Compliance: Issue a formal reminder to all workers about the importance of wearing helmets at all times. Conduct a brief safety refresher meeting at the start of each shift.

  • Site Organization: Increase efforts to clear walkways of excess materials and reallocate storage areas to improve site organization.

  • Workforce Management: Hire additional skilled labor for the exterior cladding work to maintain the planned progress and avoid further delays.


6. Conclusion

The Horizon Tower construction project is progressing well, with major structural and foundation work completed. However, some challenges, such as material delays, safety compliance issues, and site congestion, have been observed. Addressing these challenges promptly will help ensure that the project remains on schedule and upholds safety standards.