Report Date: December 20, 2055
Report Number: MM-122050-01
Location: Manufacturing Plant A, Maintenance Department
Department: Maintenance
Prepared by: [Your Name], Senior Maintenance Technician
Approved by: Jane Smith, Maintenance Manager
Machine ID: MCH-1024
Machine Model: XYZ-5000
Machine Type: CNC Milling Machine
Manufacturer: ABC Manufacturing Co.
Date of Installation: January 15, 2050
Last Service Date: October 10, 2055
Maintenance Type: Preventive
Date of Maintenance: December 20, 2055
Maintenance Duration: 9:00 AM to 12:00 PM
Technician(s) Involved: [Your Name], Sarah White
Inspection and Cleaning
Inspected machine for visible wear and tear.
Cleaned all components, including filters, belts, and bearings.
Checked fluid levels and topped off coolant and hydraulic fluids as necessary.
Parts Replaced
Replaced worn spindle bearings.
Installed a new coolant filter as per the manufacturer’s recommendations.
Lubrication
Lubricated moving parts including gears, bearings, and shafts.
Ensured all lubrication points were properly serviced.
Calibration
Calibrated machine settings to ensure optimal performance.
Tested machine operation after calibration by running a test part.
Functional Test
Ran machine through a full operational test to confirm proper function.
Monitored machine performance during test run and ensured no issues were present.
Operational Status: Fully Operational
Performance: Normal
Identified Issues: None
No issues were found during a routine inspection.
The machineare is operating at full capacity with no unusual vibrations or noises.
Parts Replaced:
Spindle Bearings (2) - Supplier: Precision Parts Co.
Coolant Filter (1) - Supplier: CleanTech Solutions
Parts Used from Inventory:
Lubricant (500 mL)
Coolant (5 Liters)
Parts Ordered:
Hydraulic Seal Kit (1) - Expected Delivery Date: December 22, 2055
Immediate Actions Required:
No immediate actions required at this time.
Preventive Measures:
Continue monitoring coolant levels regularly.
Perform cleaning and inspection of the coolant system every 3 months.
Future Maintenance Requirements:
Next preventive maintenance is recommended in 6 months (June 2056), including bearing checks and lubrication.
The maintenance activities for CNC Milling Machine MCH-1024 were completed on December 20, 2055. All essential parts were inspected, cleaned, lubricated, and calibrated. The machine is now fully operational and functioning as expected. No major issues were identified, and preventive maintenance measures were recommended to ensure continued optimal performance.
Report Prepared by:
[Your Name]
Senior Maintenance Technician
December 20, 2055
Approved by:
Jane Smith
Maintenance Manager
December 20, 2055