Free Machine Maintenance Report Template

Download

Share

Free Machine Maintenance Report Template

Machine Maintenance Report


Report Date: December 20, 2055
Report Number: MM-122050-01
Location: Manufacturing Plant A, Maintenance Department
Department: Maintenance
Prepared by: [Your Name], Senior Maintenance Technician
Approved by: Jane Smith, Maintenance Manager


I. Machine Information

  • Machine ID: MCH-1024

  • Machine Model: XYZ-5000

  • Machine Type: CNC Milling Machine

  • Manufacturer: ABC Manufacturing Co.

  • Date of Installation: January 15, 2050

  • Last Service Date: October 10, 2055


II. Maintenance Summary

  • Maintenance Type: Preventive

  • Date of Maintenance: December 20, 2055

  • Maintenance Duration: 9:00 AM to 12:00 PM

  • Technician(s) Involved: [Your Name], Sarah White


III. Maintenance Activities Performed

  1. Inspection and Cleaning

    • Inspected machine for visible wear and tear.

    • Cleaned all components, including filters, belts, and bearings.

    • Checked fluid levels and topped off coolant and hydraulic fluids as necessary.

  2. Parts Replaced

    • Replaced worn spindle bearings.

    • Installed a new coolant filter as per the manufacturer’s recommendations.

  3. Lubrication

    • Lubricated moving parts including gears, bearings, and shafts.

    • Ensured all lubrication points were properly serviced.

  4. Calibration

    • Calibrated machine settings to ensure optimal performance.

    • Tested machine operation after calibration by running a test part.

  5. Functional Test

    • Ran machine through a full operational test to confirm proper function.

    • Monitored machine performance during test run and ensured no issues were present.


IV. Machine Condition

  • Operational Status: Fully Operational

  • Performance: Normal

  • Identified Issues: None

    • No issues were found during a routine inspection.

    • The machineare is operating at full capacity with no unusual vibrations or noises.


V. Parts Inventory

  • Parts Replaced:

    • Spindle Bearings (2) - Supplier: Precision Parts Co.

    • Coolant Filter (1) - Supplier: CleanTech Solutions

  • Parts Used from Inventory:

    • Lubricant (500 mL)

    • Coolant (5 Liters)

  • Parts Ordered:

    • Hydraulic Seal Kit (1) - Expected Delivery Date: December 22, 2055


VI. Maintenance Recommendations

  • Immediate Actions Required:

    • No immediate actions required at this time.

  • Preventive Measures:

    • Continue monitoring coolant levels regularly.

    • Perform cleaning and inspection of the coolant system every 3 months.

  • Future Maintenance Requirements:

    • Next preventive maintenance is recommended in 6 months (June 2056), including bearing checks and lubrication.


VII. Conclusion

The maintenance activities for CNC Milling Machine MCH-1024 were completed on December 20, 2055. All essential parts were inspected, cleaned, lubricated, and calibrated. The machine is now fully operational and functioning as expected. No major issues were identified, and preventive maintenance measures were recommended to ensure continued optimal performance.


Report Prepared by:

[Your Name]

Senior Maintenance Technician
December 20, 2055

Approved by:

Jane Smith

Maintenance Manager
December 20, 2055


Report Templates @ Template.net