Free Monthly Maintenance Report Template
Monthly Maintenance Report
Report Date: December 20, 2050
Facility Name: Horizon Plaza
Address: 456 Summit Road, Metropolis, XY 56789
Prepared By: [Your Name]
Maintenance Team: Horizon Building Services
1. Introduction
This Monthly Maintenance Report provides an overview of the maintenance activities carried out at Horizon Plaza throughout December 2050. It includes a summary of tasks completed, the condition of building systems, issues identified, actions taken, and any recommendations for future maintenance. The report is intended to ensure that all facility operations remain smooth, efficient, and compliant with safety regulations.
2. Maintenance Activities Summary
Date |
Maintenance Task |
Description |
Status |
Comments |
---|---|---|---|---|
12/01/2050 |
HVAC Filter Replacement |
Replaced air filters in all HVAC units for better airflow. |
Completed |
Filters were replaced in all units. |
12/05/2050 |
Plumbing System Inspection |
Checked plumbing for leaks and functionality. |
Completed |
Minor leak fixed in the restroom. |
12/10/2050 |
Lighting System Check |
Inspected lighting fixtures for functionality. |
Completed |
Replaced 5 bulbs in common areas. |
12/12/2050 |
Electrical System Inspection |
Checked electrical panels and circuits for faults. |
Completed |
All circuits passed safety tests. |
12/15/2050 |
Elevator Safety Check |
Inspected and tested elevator systems. |
Completed |
The elevators are fully operational. |
12/18/2050 |
Fire Safety Equipment Inspection |
Checked fire extinguishers and alarms. |
Completed |
Fire safety equipment functional. |
12/20/2050 |
General Cleaning and Janitorial |
Comprehensive cleaning of all floors and common areas. |
Completed |
All areas were thoroughly cleaned. |
3. Issues Identified and Actions Taken
Issue |
Date Reported |
Action Taken |
Status |
Comments |
---|---|---|---|---|
Leak in Restroom Sink |
12/05/2050 |
Fixed the leak by replacing the faucet washer. |
Resolved |
The sink is now functional. |
Flickering Lights in Lobby |
12/10/2050 |
Replaced 5 faulty light bulbs in the lobby. |
Resolved |
The lighting is now stable. |
Low Refrigerant in HVAC Units |
12/12/2050 |
Refilled refrigerant in units 2 and 4. |
Resolved |
HVAC units now cooling properly. |
Faulty Fire Alarm |
12/18/2050 |
Replaced faulty fire alarm battery. |
Resolved |
The alarm is fully operational. |
4. Equipment and Parts Replaced
Part/Equipment |
Part Number |
Date Replaced |
Cost |
---|---|---|---|
Air Filters (HEPA) |
AF-HEPA-200 |
12/01/2050 |
$400 |
Faucet Washer (Rubber, 2-inch) |
FW-RUB-2INCH |
12/05/2050 |
$10 |
Light Bulbs (LED, 15W) |
LB-LED-15W |
12/10/2050 |
$75 |
Refrigerant (R-410A) |
REF-410A-50LB |
12/12/2050 |
$250 |
Fire Alarm Battery (9V) |
FA-BAT-9V |
12/18/2050 |
$20 |
5. System Performance Monitoring
System/Component |
Status |
Comments |
---|---|---|
HVAC System |
Optimal |
Units performing well after refrigerant refill. |
Plumbing System |
Operational |
The leak was repaired, and all pipes functioning. |
Lighting System |
Fully Operational |
All lighting is functioning, and bulbs are replaced. |
Electrical System |
Functional |
All electrical systems and circuits are checked and clear. |
Elevator System |
Fully Operational |
Elevators working smoothly without any issues. |
Fire Safety System |
Fully Operational |
Fire alarms and extinguishers are fully functional. |
6. Safety and Compliance Checks
-
Electrical Compliance: Ensured all electrical panels met safety regulations.
-
Fire Safety: Inspected fire alarms, extinguishers, and emergency lighting.
-
HVAC Compliance: Checked refrigerant levels and ensured proper ventilation.
-
Plumbing Safety: Inspected pipes, water systems, and fixtures for any hazards.
7. Recommendations for Future Maintenance
-
Continue monthly HVAC system inspections to ensure efficiency and prevent refrigerant issues.
-
Schedule plumbing checks every quarter to detect and prevent potential leaks early.
-
Replace air filters in HVAC units every two months to maintain optimal air quality.
-
Inspect lighting systems quarterly to replace faulty bulbs before they cause disruption.
-
Continue regular fire safety equipment checks to comply with safety standards.
8. Maintenance Costs Summary
Category |
Cost |
---|---|
HVAC Filter Replacement |
$400 |
Faucet Washer Replacement |
$10 |
Lighting System Maintenance |
$75 |
Refrigerant Refill |
$250 |
Fire Alarm Battery Replacement |
$20 |
General Janitorial Services |
$500 |
Total Maintenance Cost |
$1,255 |
9. Conclusion
The monthly maintenance activities at Horizon Plaza have been completed. All critical systems, including HVAC, plumbing, electrical, and fire safety, have been thoroughly inspected and maintained. Identified issues have been resolved promptly, ensuring that the facility operates efficiently and safely. The facility is in excellent condition, with all maintenance tasks completed on schedule.