Free School Infrastructure Report Template
School Infrastructure Report
Date: August 25, 2066
Location: Springfield International School
Report Compiled by: [Your Name], Director of Facilities
Report Prepared for: School Board of Trustees
Date of Last Assessment: August 20, 2066
Infrastructure Summary
-
Building Condition: The main building shows signs of wear and tear, particularly in the south wing. There are cracks in the exterior walls that need immediate attention. Interior conditions are acceptable, though some areas have outdated fixtures.
-
Classroom Facilities: All classrooms are functional, but the technology used in most rooms is from 2030 and is outdated by current standards. A project for upgrading to smart boards and high-speed internet is recommended.
-
Playground and Sports Areas: The playground needs renovation. The rubberized flooring has begun to erode in some areas. The sports field's lighting system is also outdated and requires replacement.
-
Accessibility: The school is compliant with current accessibility standards, though there is a need for additional ramps at the main entrance to improve access for disabled students.
-
Safety and Security: The school's security system is functioning, but there is a recommendation for installing more cameras in hallways and around outdoor spaces. Additionally, emergency exits need clearer signage.
Recommendations
-
Allocate $1.2 million for structural repairs, technology upgrades, and security enhancements.
-
Schedule the start of renovations for October 1, 2066, with an estimated completion date of March 31, 2067.