Free Professional Building Power System Checklist Template
Professional Building Power System Checklist
Prepared by: [Your Name]
Company: [Your Company Name]
Date: [Insert Date]
1. Pre-Inspection Preparation
Checklist Item |
Completed? |
Comments |
---|---|---|
Verify power system documentation and schematics |
|
|
Ensure inspection tools are calibrated and ready. |
|
|
Confirm all safety equipment is on hand (gloves, goggles, etc.) |
|
|
Notify building occupants of the inspection schedule. |
|
|
Secure necessary access to power rooms, panels, and equipment. |
|
|
Review any previous maintenance and inspection reports. |
|
2. Electrical Panel and Circuit Inspection
Checklist Item |
Completed? |
Comments |
---|---|---|
Inspect the main electrical panel for signs of wear or damage |
|
|
Check that all circuit breakers are labeled correctly. |
|
|
Ensure proper grounding and bonding connections. |
|
|
Inspect circuit breakers for overheating or corrosion. |
|
|
Verify the proper functioning of safety switches. |
|
|
Confirm that panel doors close securely. |
|
3. Backup Power System (Generator) Inspection
Checklist Item |
Completed? |
Comments |
---|---|---|
Test generator operation and automatic transfer switch |
|
|
Check fuel levels and verify no fuel leaks. |
|
|
Inspect battery charge levels and terminals. |
|
|
Run a simulated power outage test to verify functionality. |
|
|
Ensure the generator is in a clean and ventilated area. |
|
|
Review generator maintenance history |
|
4. Power Distribution and Load Testing
Checklist Item |
Completed? |
Comments |
---|---|---|
Conduct load test to measure power distribution balance |
|
|
Check for any overloaded circuits. |
|
|
Monitor voltage and current at various points in the system. |
|
|
Verify that all distribution boards are functioning correctly. |
|
|
Inspect transformers for any signs of overheating or damage. |
|
|
Confirm proper functioning of uninterruptible power supplies (UPS) |
|
5. Safety and Final Review
Checklist Item |
Completed? |
Comments |
---|---|---|
Test all emergency power systems and lighting |
|
|
Inspect the grounding system for safety and compliance. |
|
|
Verify that all electrical rooms have clear signage and access |
|
|
Confirm that fire protection systems are in place in power rooms. |
|
|
Document any repairs or replacements completed during the inspection |
|
|
Final review and approval from the building supervisor |
|