Professional Building Power System Checklist

Professional Building Power System Checklist


Prepared by: [Your Name]

Company: [Your Company Name]

Date: [Insert Date]


1. Pre-Inspection Preparation

Checklist Item

Completed?

Comments

Verify power system documentation and schematics

  • Yes

  • No

Ensure inspection tools are calibrated and ready.

  • Yes

  • No

Confirm all safety equipment is on hand (gloves, goggles, etc.)

  • Yes

  • No

Notify building occupants of the inspection schedule.

  • Yes

  • No

Secure necessary access to power rooms, panels, and equipment.

  • Yes

  • No

Review any previous maintenance and inspection reports.

  • Yes

  • No


2. Electrical Panel and Circuit Inspection

Checklist Item

Completed?

Comments

Inspect the main electrical panel for signs of wear or damage

  • Yes

  • No

Check that all circuit breakers are labeled correctly.

  • Yes

  • No

Ensure proper grounding and bonding connections.

  • Yes

  • No

Inspect circuit breakers for overheating or corrosion.

  • Yes

  • No

Verify the proper functioning of safety switches.

  • Yes

  • No

Confirm that panel doors close securely.

  • Yes

  • No


3. Backup Power System (Generator) Inspection

Checklist Item

Completed?

Comments

Test generator operation and automatic transfer switch

  • Yes

  • No

Check fuel levels and verify no fuel leaks.

  • Yes

  • No

Inspect battery charge levels and terminals.

  • Yes

  • No

Run a simulated power outage test to verify functionality.

  • Yes

  • No

Ensure the generator is in a clean and ventilated area.

  • Yes

  • No

Review generator maintenance history

  • Yes

  • No


4. Power Distribution and Load Testing

Checklist Item

Completed?

Comments

Conduct load test to measure power distribution balance

  • Yes

  • No

Check for any overloaded circuits.

  • Yes

  • No

Monitor voltage and current at various points in the system.

  • Yes

  • No

Verify that all distribution boards are functioning correctly.

  • Yes

  • No

Inspect transformers for any signs of overheating or damage.

  • Yes

  • No

Confirm proper functioning of uninterruptible power supplies (UPS)

  • Yes

  • No


5. Safety and Final Review

Checklist Item

Completed?

Comments

Test all emergency power systems and lighting

  • Yes

  • No

Inspect the grounding system for safety and compliance.

  • Yes

  • No

Verify that all electrical rooms have clear signage and access

  • Yes

  • No

Confirm that fire protection systems are in place in power rooms.

  • Yes

  • No

Document any repairs or replacements completed during the inspection

  • Yes

  • No

Final review and approval from the building supervisor

  • Yes

  • No

Checklist Templates @ Template.net