Prepared by: [Your Name]
Company: [Your Company Name]
Date: [Insert Date]
Checklist Item | Completed? | Comments |
---|---|---|
Verify power system documentation and schematics |
| |
Ensure inspection tools are calibrated and ready. |
| |
Confirm all safety equipment is on hand (gloves, goggles, etc.) |
| |
Notify building occupants of the inspection schedule. |
| |
Secure necessary access to power rooms, panels, and equipment. |
| |
Review any previous maintenance and inspection reports. |
|
Checklist Item | Completed? | Comments |
---|---|---|
Inspect the main electrical panel for signs of wear or damage |
| |
Check that all circuit breakers are labeled correctly. |
| |
Ensure proper grounding and bonding connections. |
| |
Inspect circuit breakers for overheating or corrosion. |
| |
Verify the proper functioning of safety switches. |
| |
Confirm that panel doors close securely. |
|
Checklist Item | Completed? | Comments |
---|---|---|
Test generator operation and automatic transfer switch |
| |
Check fuel levels and verify no fuel leaks. |
| |
Inspect battery charge levels and terminals. |
| |
Run a simulated power outage test to verify functionality. |
| |
Ensure the generator is in a clean and ventilated area. |
| |
Review generator maintenance history |
|
Checklist Item | Completed? | Comments |
---|---|---|
Conduct load test to measure power distribution balance |
| |
Check for any overloaded circuits. |
| |
Monitor voltage and current at various points in the system. |
| |
Verify that all distribution boards are functioning correctly. |
| |
Inspect transformers for any signs of overheating or damage. |
| |
Confirm proper functioning of uninterruptible power supplies (UPS) |
|
Checklist Item | Completed? | Comments |
---|---|---|
Test all emergency power systems and lighting |
| |
Inspect the grounding system for safety and compliance. |
| |
Verify that all electrical rooms have clear signage and access |
| |
Confirm that fire protection systems are in place in power rooms. |
| |
Document any repairs or replacements completed during the inspection |
| |
Final review and approval from the building supervisor |
|
Templates
Templates